Items - ISOLATORS,SCREENING,LAT,NRE,STRUCTURAL,THERMAL,MULTIPACTION,SCREENING TEST CHARGES,POWER HANDLING
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | ISOLATORS | Isolators High Power L2 band FM Isolator PIN type as per RFP document | 17 | NO | rajeshsingh | 469 |
2 | SCREENING | Screening Test Charges on FM UNITS External Visual Inspection Physical dimension Initial performance test Thermal ShockTemp storage Operational temp and Insertion Loss Glitch Test Random Vibration Final Performance test as RFP doc RQA Annex Table 2 | 16 | NO | rajeshsingh | 469 |
3 | LAT | LOT ACCEPTANCE TEST LAT Visual Insp Initial Test Thermal Shock Temp Storage Operational Temp Sine and Random Vibration Mech Pyro Shock Humidity SS thermovacc and EMI EMC test Power handling Final Test Resistance to solvent as RFP doc RQA Annex Table2 | 1 | NO | rajeshsingh | 469 |
4 | NRE | Documentation NRE Qualification Charges Isolator design NRE document and test fixture consisting of TNC connector and spacer for L band PIN type isolator | 2 | NO | rajeshsingh | 469 |
5 | STRUCTURAL | Documentation NRE Qualification Charges Documentation for Structural Analysis | 1 | NO | rajeshsingh | 469 |
6 | THERMAL | Documentation NRE Qualification Charges Documentation for Thermal Analysis | 1 | NO | rajeshsingh | 469 |
7 | MULTIPACTION | Documentation NRE Qualification Charges Documentation for Multipaction Analysis | 1 | NO | rajeshsingh | 469 |
8 | SCREENING TEST CHARGES | Screening Test Charges Multipaction Test charges as per RFP document RQA Annexure Table 2 | 1 | NO | rajeshsingh | 469 |
9 | POWER HANDLING | Screening Test Charges Power handing Test on FM units as per RFP document RQA Annexure Table 2 | 16 | NO | rajeshsingh | 469 |