Bidhelp
Ministry of Civil Aviation
Airports Authority of India (AAI)
NA
PUNJAB QTY : 1271

Items - Supply of Heavy duty Rollers,Supply of Heavy duty baggage bumpers,Supply of Heavy duty Chain links,Supply of Pressure Rollers,Supply of V Belt 50mm Thick,Supply of Bearing UC207 UC206 or equivalent,Supply of End Roller of suitable dia,Supply of Return roller of suitable dia,Supply of PVC conveyor belt black Smooth Top Belt,Supply of PVC conveyor belt black rough top,Supply of Drive motor Carousel 2.2 Kw,Supply of Heavy duty inclined steel slats,Supply of Support of Heavy Duty Baggage Bumper,Supply of Belt jointing of PVC conveyer belt,Supply of Digital ammeter or voltmeter,Supply of Exhaust fan of Control Panel,Supply of Relay,Supply of Contactor,Supply of Circuit Breaker,Supply of PLC input Module,Supply of PLC output Module,Repair and Modification of existing Control,Major Overhauling of existing International Arrival baggage handling System,Painting of shutter control panel,Phase II Operation of existing International Arrival Baggage Handling system,Annual Maintenance Contract of complete international Arr

Tender Details
Costs
BOQ
Item NumberItem TitleItem DescriptionItem QuantityUnit of MeasureConsignee IDDelivery Period (In number of days)
1 Supply of Heavy duty Rollers Supply of Heavy duty Rollers compatible with existing Slat type Arrival Baggage Handling System 300 Nos vpmoril@aai.aero 730
2 Supply of Heavy duty baggage bumpers Supply of Heavy duty baggage bumpers compatible with existing Slat type Arrival Baggage Handling System 500 Nos vpmoril@aai.aero 730
3 Supply of Heavy duty Chain links Supply of Heavy duty Chain links compatible with existing Slat type Arrival Baggage Handling System 50 Nos vpmoril@aai.aero 730
4 Supply of Pressure Rollers Supply of Pressure Rollers compatible with existing Slat type Arrival Baggage Handling System 20 Nos vpmoril@aai.aero 730
5 Supply of V Belt 50mm Thick Supply of V Belt 50mm Thick compatible with existing Slat type Arrival Baggage Handling System 2 Nos vpmoril@aai.aero 730
6 Supply of Bearing UC207 UC206 or equivalent Supply of Bearing UC207 UC206 or equivalent compatible with existing Slat type Arrival Baggage Handling System 20 Nos vpmoril@aai.aero 730
7 Supply of End Roller of suitable dia Supply of End Roller of suitable dia compatible with existing Slat type Arrival Baggage Handling System 2 Nos vpmoril@aai.aero 730
8 Supply of Return roller of suitable dia Supply of Return roller of suitable dia compatible with existing Slat type Arrival Baggage Handling System 2 Nos vpmoril@aai.aero 730
9 Supply of PVC conveyor belt black Smooth Top Belt Supply of PVC conveyor belt black Smooth Top Belt compatible with existing Slat type Arrival Baggage Handling System 60 Mtr vpmoril@aai.aero 730
10 Supply of PVC conveyor belt black rough top Supply of PVC conveyor belt black rough top compatible with existing Slat type Arrival Baggage Handling System 120 Mtr vpmoril@aai.aero 730
11 Supply of Drive motor Carousel 2.2 Kw Supply of Drive motor Carousel 2.2 Kw compatible with existing Slat type Arrival Baggage Handling System 1 Nos vpmoril@aai.aero 730
12 Supply of Heavy duty inclined steel slats Supply of Heavy duty inclined steel slats compatible with existing Slat type Arrival Baggage Handling System 10 Nos vpmoril@aai.aero 730
13 Supply of Support of Heavy Duty Baggage Bumper Supply of Support of Heavy Duty Baggage Bumper compatible with existing Slat type Arrival Baggage Handling System 10 Nos vpmoril@aai.aero 730
14 Supply of Belt jointing of PVC conveyer belt Supply of Belt jointing of PVC conveyer belt rough top or smooth top by hot vulcanizing or any standard practice 7 Nos vpmoril@aai.aero 730
15 Supply of Digital ammeter or voltmeter Supply of Digital ammeter or voltmeter of control panel as per existing sample 2 Nos vpmoril@aai.aero 730
16 Supply of Exhaust fan of Control Panel Supply of Exhaust fan of Control Panel compatible with existing panel 1 Nos vpmoril@aai.aero 730
17 Supply of Relay Supply of Relay compatible with PLC and Control Panel available for existing International Arrival Baggage Handling System at Amritsar Airport 20 Nos vpmoril@aai.aero 730
18 Supply of Contactor Supply of Contactor compatible with PLC and Control Panel available for existing International Arrival Baggage Handling System at Amritsar Airport 20 Nos vpmoril@aai.aero 730
19 Supply of Circuit Breaker Supply of Circuit Breaker compatible with PLC and Control Panel available for existing International Arrival Baggage Handling System at Amritsar Airport 20 Nos vpmoril@aai.aero 730
20 Supply of PLC input Module Supply of PLC input Module compatible with PLC and Control Panel available for existing International Arrival Baggage Handling System at Amritsar Airport 5 Nos vpmoril@aai.aero 730
21 Supply of PLC output Module Supply of PLC output Module compatible with PLC and Control Panel available for existing International Arrival Baggage Handling System at Amritsar Airport 5 Nos vpmoril@aai.aero 730
22 Repair and Modification of existing Control Repair and Modification of existing Control Panel to start the operation in Auto and Manual mode including i Replacement of worn out material such as Relays Contactor and Circuit Breaker etc ii) Replacement of worn out wiring filter etc ii Replacement and reprograming of PLC (if required) Cost of spares is not included in this item iv Auto and Manual ON or OFF of shutter Cost of spares is not included in this item 2 Job vpmoril@aai.aero 730
23 Major Overhauling of existing International Arrival baggage handling System Major Overhauling of existing International Arrival baggage handling System including i) Belt will be dismantled, all moving parts will be checked, greased as required, replacement of damaged parts as required, ii) Repair of any damage of arrival carousal frame. iii) Repair of any damaged parts iv) Check for smooth operation of the entire BHS system Cost of spares is not included in this item. 4 Job vpmoril@aai.aero 730
24 Painting of shutter control panel Painting of shutter control panel side cover side guard etc of Conveyer belts by enamel paint as per approved colour by EIC 40 sqm vpmoril@aai.aero 730
25 Phase II Operation of existing International Arrival Baggage Handling system Phase II Operation of existing International Arrival Baggage Handling system 2 Sets complete in all respect on all days including Sundays and Holidays by deployment of Following manpower A Highly skilled 01 Nos General Shift B Skilled 01 Nos 3 shifts per day C Un Skilled 01 Nos 3 shift per day 24 Month vpmoril@aai.aero 730
26 Annual Maintenance Contract of complete international Arrival Baggage Handling System Annual Maintenance Contract of complete international Arrival Baggage Handling System 2 Sets including consumable and manpower required for troubleshooting routine maintenance preventive maintenance and breakdown maintenance etc as required as per good engineering practice recommendation of manufacturer and instructions of engineer in charge for maintaining the system in acceptable functional operational and serviceable state Cost of spares is not included in this item 24 Month vpmoril@aai.aero 730