Items - Base Preparation with Asphalt Work,Turf 8 layer Synthetic Surface with Cushion and line marking,Pole Gear System 02 Antenna 02 Nets and 01 Refree Chair,LED Display Score Board 4 ft x 3 ft with 2.43m height above the ground including installation,Installation of 04 Nos 8 mtr poles with 4 LED flood Light in each pole,Chain Link Fence 110 mtr
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | Base Preparation with Asphalt Work | Base Preparation with Asphalt Work | 1 | Job | Vishnu@654 | 180 |
2 | Turf 8 layer Synthetic Surface with Cushion and line marking | Turf 8 layer Synthetic Surface with Cushion and line marking | 1 | Job | Vishnu@654 | 180 |
3 | Pole Gear System 02 Antenna 02 Nets and 01 Refree Chair | Pole Gear System 02 Antenna 02 Nets and 01 Refree Chair | 1 | Job | Vishnu@654 | 180 |
4 | LED Display Score Board 4 ft x 3 ft with 2.43m height above the ground including installation | LED Display Score Board 4 ft x 3 ft with 2.43m height above the ground including installation | 1 | Job | Vishnu@654 | 180 |
5 | Installation of 04 Nos 8 mtr poles with 4 LED flood Light in each pole | Installation of 04 Nos 8 mtr poles with 4 LED flood Light in each pole | 1 | Job | Vishnu@654 | 180 |
6 | Chain Link Fence 110 mtr | Chain Link Fence 110 mtr | 1 | Job | Vishnu@654 | 180 |