Items - Balance work of FOB extension at IDG station.
Items - Raipur Division - Bilaspur-Durg - TBR - 62.542 Tkm under the jurisdiction of ADEN/I/Bhilai & Raipur-Lakholi-TBR - 7.072 Tkm under the jurisdiction of ADEN/Track/Raipur
Items - Request for Proposal for Jeypore -Navarangpur New Railway Line project: Construction of New BG Railway Line Between Ambaguda(Excluding) (13.60 Km) to Navarangpur (Including) (44.14 Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(Excluding Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, Modification/ Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc on EPC Basis in Waltair Division of East Coast Railway on Engineering, Procurement & Construction (EPC) Mode.
Items - At MLG (HQ) Division -(Part A) Provision of 1733 KWp Grid connected rooftop Solar Power plant including 5 years AMC/CAMC at rooftop of Service building & residential buildings in Goshala & Nambari Area.
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - "Supply and application of Interior vinyl Graphics RDSO Specification No. RDSO/2010/CG-08 on lavatories inside wall panels, gangway and doorway panels, Flap door arrangement of Water Tank and switch board panels in compartment. Make only from M/s 3M India Limited or M/s Avery Dennison ICF coaches at Motibagh Workshop Nagpur as per scope of work".
Items - Repairs to Running Room at Bayana Station.
Items - HIRING THE SERVICES OF MATERIAL HANDLING EQUIPMENT (MHE) SUCH AS DIESEL OPERATED FORKLIFT TRUCKS AND ROAD MOBILE CRANE WITH DRIVER AND TWO HELPERS FOR EACH EQUIPMENT FOR LHB DIVISION FOR A PERIOD OF TWO YEARS(600 DAYS)
Items - Electrical work for " Replacement of old defective power panels in workshop area, PLW/PTA"
Items - Dadar :- Repairs to platform surfacing on platform no.5/6 at Dadar station on urgent basis.
Items - Ultrasonic Testing of welds using contractors RDSO approved hand operated ultrasonic weld tester as per Indian Railway Specification for "Ultrasonic Testing of Rails and Welds (Provisional) 2012 in MYS Division with all correction slips" for a period of one year.
Items - Comprehensive Annual Maintenance Contract of Hitachi Make EI system for Signaling interlocking in CNB-BDN section of Sr. DSTE/CNB, Prayagraj Division for a period of Thirty Six Months.
Items - 1). Bardoli & Chalthan Goods Shed: Construction of Labors rest room, traders room, goods office with allied facilities, two high mast and Goods office. 2). Udhna-UkaiSonghad section- Deficiency removal of LC Gates under ADEN VYA SECTION 3). UDN-USD- Renovation/Repairing work of union office of WREU VYA branch. 4). Udhna Ukai songadh sec:-Construction of Boundary wall at CHM,TBV,LTV,VYA,KKRD under ADENVYA Section. (Composite Tender including Electrical works)
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - Augmentation of Electrical asset and other ancillary work in all running room, rest room, crew lobby over ASN DIVN(Phase-I).
Items - Bilaspur-Durg - CTR(S) - 13.393 Tkm & Raipur-Lakholi - CTR(S) - 18.659 Tkm.
Items - TRD works in connection with Increase in crossover length (TNC to TNC) under the jurisdiction of DEN/II/RNY
Items - CONSTRUCTION OF TWO LANE ROB IN LIEU OF LC NO.19A AT KM 17/0-1 BETWEEN LAHLI-KALANAUR STATION ON ROHTAK-BHIWANI SECTION and CONSTRUCTION OF FOUR LANE ROB IN LIEU OF LC NO.35 AT KM 56/2-3 IN Charkhi Dadri YARD ON REWARI-HISAR SECTION both UNDER CONSTRUCTIO UNIT OF NWR - DY/CE/C/BNW.
Items - Plain Copier Paper (V3) ISI Marked to IS 14490,Plain Copier Paper (V3) ISI Marked to IS 14490,Glue Stick (V2),Black Lead Pencils (V2) as per IS 1375
Items - Metallic Signage (V2),Metallic Signage (V2),Metallic Signage (V2)