Items - Bilaspur-Durg - CTR(S) - 13.393 Tkm & Raipur-Lakholi - CTR(S) - 18.659 Tkm.
Items - CCG - VR section - Reconditioning of Built up crossing, Tongue rail , SEJs and broken slide chair etc. under ADEN (T / S ) PL & ADEN ( T / N ) BVI section.
Items - SWR-SBC Division-Converting of existing Pilgrim siding (Rd-4) as common Loop at SSPN Station, TMS siding at SSPN and MSDAC work at SSPN of Bangalore Division.
Items - Re-Certification of IMS (ISO 9001:2015, 14001:2015 and OHSAS 45001:2018) at Mechanical Workshop Izatnagar (As per scope of work) for period of 38 months.
Items - Dadar :- Repairs to platform surfacing on platform no.5/6 at Dadar station on urgent basis.
Items - Provision of Safety fencing along the track for running of trains in Talcher Road - Kerejanga section under the jurisdiction of ADEN/Angul of Khurda Road Division.
Items - Ultrasonic Testing of welds using contractors RDSO approved hand operated ultrasonic weld tester as per Indian Railway Specification for "Ultrasonic Testing of Rails and Welds (Provisional) 2012 in MYS Division with all correction slips" for a period of one year.
Items - HIRING THE SERVICES OF MATERIAL HANDLING EQUIPMENT (MHE) SUCH AS DIESEL OPERATED FORKLIFT TRUCKS AND ROAD MOBILE CRANE WITH DRIVER AND TWO HELPERS FOR EACH EQUIPMENT FOR LHB DIVISION FOR A PERIOD OF TWO YEARS(600 DAYS)
Items - Appointment of General Consultant for OFFICE OF THE CHIEF ADMINISTRATIVE OFFICER, CONSTRUCTION, SOUTHERN RAILWAY, CHENNAI, EGMORE, ASSOCIATED OFFICES OF CAO/CN/MS AND OFFICE OF PCE/MAS
Items - Annual Maintenance Contract (AMC) and preventive maintenance of 08-Wheeler and 04-Wheeler Tower Wagons as per RDSO/OEM guidelines of Lucknow Division (Northern Railways) for Two Years.
Items - At APDJ Div : Provision of 1000 KWp grid connected rooftop solar power plant at DLO, HSA,BNV, NOQ & KAMG station.
Items - Upgradation of IP based CCTV Surveillance System for North South section of Metro Railway Kolkata
Items - Requirement of contractual Manpower (Mechanical) for Mechanical section of Forged Wheel Plant-MCF to manage shift operation, preventive and breakdown maintenance for 24 months" as per scope of Work.
Items - TRD works in connection with Increase in crossover length (TNC to TNC) under the jurisdiction of DEN/II/RNY
Items - Removal and cleaning of CTRBs of BG wagon wheel sets (As per Scope of Work)
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - Provision / improvement of Amenities (other than FOB) for Divyangjan at the station as per new guidelines by the Railway Board under the jurisdiction of Divisional Engineer (North) Jabalpur
Items - Wagon repair activities at KUR yard for a period of one years.
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - Electrical work in c/w "Provision of BLDC ceiling fan at station, service building and PF lights over MLDT Division. (Phase-II)".