Items - CCG-VR section - Virar Carshed - Proposal for outsourcing maintenance of new assets in VR carshed for a period of two years.
Items - Reliability improvement of interlocked LC gate by providing Slide Boom in Sealdah Division.
Items - Removal and cleaning of CTRBs of BG wagon wheel sets (As per Scope of Work)
Items - At PNO : Provision of solar plant by covering the roof Top of various service buildings , Railway station, Parking area in PNO area.
Items - Design, Supply, Erection, Testing & Commissioning of 25 KV AC OHE work under Dahod Yard Modification work in connection with new line work between Dahod - Indore, of Ratlam Division, Western Railway
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - Replacement of corroded top flange plate, corroded members, corroded chequared plate at Br.No.260 (1x12.20m+2x18.30m Plate girder), Br.No.261 (3x18.30m Plate girder), Br.No.292 (2x18.30m plate girder)Br.No.306 (1x18.30m Plate girder), Br.No.309 (1x12.20m+2x18.30m), Br.No.322 (1x9.15m), Br.No.593 (3x12.19m), Br.No.597 (4x45.72m+8x24.40m) and replacement of corroded rivtes in HAS-MAJN section (including SKLR-SBHR ghat section) in SSE/Bridges/SKLR jurisdiction.
Items - Signalling work in Connection with provision of TTR(TWS)1:12 (Total 142 Sets) in RPC Section and provision of TTR & TTSR(Through Turn Out Sleeper Renewal) with 60 KG PRC Sleepers of P&C of 1:12 (8 Nos) and 1:8.5 (9 Nos) in Jaipur-Bandikui Section of Jaipur division.
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - Construction of station buildings, covering shed, Passenger/Goods platform passenger amenities, Foot Over Bridge, construction of service buildings of Elect./S&T structures, staff quarters, circulating area, RCC Road, RCC Over Head Tank, yard drain and other misc. works at proposed LOTNA station (B-class) in connection with gauge conversion between MYG-DB-SMLA GC (96.46Km) Project on Vadodara Division of Western Railway.
Items - SWR-SBC Division-Converting of existing Pilgrim siding (Rd-4) as common Loop at SSPN Station, TMS siding at SSPN and MSDAC work at SSPN of Bangalore Division.
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - Annual maintenance contract (AMC) for carrying out servicing including checking, repairing and maintenance of USFD machines working over Raipur Division and also for the supply of spare parts for a period of two years.
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - At PNO : Provision of Solar Plant by covering the Roof Top of Various Staff quarters in PNO Area.
Items - (1) MACLS Outdoor and Indoor works in connection with provision of Distributed Electronic Interlocking at Guntakal West Station (2) MACLS Outdoor and Indoor works (Alteration to existing Kyosan make EI) at Mallappa Gate station and (3) Shifting of S&T gears at Guntakal West Station (from km.0.00 to km. 2.00) & Mallappa Gate station (from km.8.10 to km. 9.64).
Items - At NGC - Provision of solar plant by covering the Roof Top of Various staff quarters and LC gates in NGC area.
Items - Comprehensive contract for modification of coaches as RDSO modification sheet No (i) : RDSO/PE/MS/AC/0089(Rev 0-2022, Dated: 06.02.2023 for Differential Pressure switch, (ii) RDSO/PE/MS/AC/0087(Rev.0)/2022, Dated 07.06.2022 for NTC sensor, for LHB AC coaches of IZN Division.
Items - "Radiography Test of Welded Test plate for a period of three (03) years from BARC/AERB approved outside agency on open tender basis."
Items - Providing and erecting "W" metal cattle barrier along the track to prevent CRO in Jhansi - Kanpur section.