Items - (1) MACLS Outdoor and Indoor works in connection with provision of Distributed Electronic Interlocking at Guntakal West Station (2) MACLS Outdoor and Indoor works (Alteration to existing Kyosan make EI) at Mallappa Gate station and (3) Shifting of S&T gears at Guntakal West Station (from km.0.00 to km. 2.00) & Mallappa Gate station (from km.8.10 to km. 9.64).
Items - Narwana - Kueukshetra - Rebuilding of bridge no. 6,17,19,20,22,24,27 (RCC slab Bridge) & 62 (Arch Bride) on NRW - KKDE section in the section of SSE/W/KKDE under ADEN/KUN.
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - Annual maintenance contract (AMC) for carrying out servicing including checking, repairing and maintenance of USFD machines working over Raipur Division and also for the supply of spare parts for a period of two years.
Items - SCR Construction Organization- Secunderabad Division- Proposed Junction arrangements at Parli vaijnath station in connection with Doubling of Parbhani- Parli stations, Bypass line at Parli yard and connectivity of new line of Ahmed Nagar- Beed-Parlivaijnath at Parli yard: Execution of additional works of earth work in formation, Construction of minor bridges, Construction of Goomties, collection of Ballast, transportation of P.Way materials, laying and linking of track and other connected miscellaneous works etc.at Parli yard
Items - At NGC - Provision of solar plant by covering the Roof Top of Various staff quarters and LC gates in NGC area.
Items - Annual Zone Work for maintenance of staff qtrs and service building in branch line JHI-SNP section under SSE/W/JHI.
Items - Painting of steel structures due for painting during the year 2024-25 under SSE/Br/MYS section.
Items - Metallizing,painting,steel structure of elevated road at Dadar and FOB's between Churchgate -Khar section.
Items - Provision of Safety fencing along the track for running of trains in Gurudijhatia - Talcher Road section under the jurisdiction of ADEN/Dhenkanal of Khurda Road Division.
Items - Requirement of contractual Manpower (Mechanical) for Mechanical section of Forged Wheel Plant-MCF to manage shift operation, preventive and breakdown maintenance for 24 months" as per scope of Work.
Items - At PNO : Provision of Solar Plant by covering the Roof Top of Various Staff quarters in PNO Area.
Items - At PNO : Provision of solar plant by covering the roof Top of various service buildings , Railway station, Parking area in PNO area.
Items - Providing and erecting "W" metal cattle barrier along the track to prevent CRO in Jhansi - Kanpur section.
Items - Removal and cleaning of CTRBs of BG wagon wheel sets (As per Scope of Work)
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - Comprehensive contract for modification of coaches as RDSO modification sheet No (i) : RDSO/PE/MS/AC/0089(Rev 0-2022, Dated: 06.02.2023 for Differential Pressure switch, (ii) RDSO/PE/MS/AC/0087(Rev.0)/2022, Dated 07.06.2022 for NTC sensor, for LHB AC coaches of IZN Division.
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - Repair to cess at km. 21/0 - 22/0, 27/0 - 28/0, 33/7 - 34/16, 37/5 - 38/0, 38/12-40/0, 41/5 - 42/0, 42/0 - 47/5, 49/3-51/5, 53/0-54/0 and 67/5-69/1 and provision of Ballast retainer at various locations on ROK-PNP section
Items - Bilaspur-Durg - CTR(S) - 13.393 Tkm & Raipur-Lakholi - CTR(S) - 18.659 Tkm.