Items - Signalling work in Connection with provision of TTR(TWS)1:12 (Total 142 Sets) in RPC Section and provision of TTR & TTSR(Through Turn Out Sleeper Renewal) with 60 KG PRC Sleepers of P&C of 1:12 (8 Nos) and 1:8.5 (9 Nos) in Jaipur-Bandikui Section of Jaipur division.
Items - Construction of station buildings, covering shed, Passenger/Goods platform passenger amenities, Foot Over Bridge, construction of service buildings of Elect./S&T structures, staff quarters, circulating area, RCC Road, RCC Over Head Tank, yard drain and other misc. works at proposed LOTNA station (B-class) in connection with gauge conversion between MYG-DB-SMLA GC (96.46Km) Project on Vadodara Division of Western Railway.
Items - Narwana - Kueukshetra - Rebuilding of bridge no. 6,17,19,20,22,24,27 (RCC slab Bridge) & 62 (Arch Bride) on NRW - KKDE section in the section of SSE/W/KKDE under ADEN/KUN.
Items - Annual Zone Work for maintenance of staff qtrs and service building in branch line JHI-SNP section under SSE/W/JHI.
Items - Annual maintenance contract (AMC) for carrying out servicing including checking, repairing and maintenance of USFD machines working over Raipur Division and also for the supply of spare parts for a period of two years.
Items - At NGC - Provision of solar plant by covering the Roof Top of Various staff quarters and LC gates in NGC area.
Items - Metallizing,painting,steel structure of elevated road at Dadar and FOB's between Churchgate -Khar section.
Items - Providing and erecting "W" metal cattle barrier along the track to prevent CRO in Jhansi - Kanpur section.
Items - Painting of steel structures due for painting during the year 2024-25 under SSE/Br/MYS section.
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - Provision of Safety fencing along the track for running of trains in Gurudijhatia - Talcher Road section under the jurisdiction of ADEN/Dhenkanal of Khurda Road Division.
Items - Request for Proposal for Jeypore -Navarangpur New Railway Line project: Construction of New BG Railway Line Between Ambaguda(Excluding) (13.60 Km) to Navarangpur (Including) (44.14 Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(Excluding Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, Modification/ Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc on EPC Basis in Waltair Division of East Coast Railway on Engineering, Procurement & Construction (EPC) Mode.
Items - At PNO : Provision of Solar Plant by covering the Roof Top of Various Staff quarters in PNO Area.
Items - Dadar :- Repairs to platform surfacing on platform no.5/6 at Dadar station on urgent basis.
Items - At PNO : Provision of solar plant by covering the roof Top of various service buildings , Railway station, Parking area in PNO area.
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - Comprehensive contract for modification of coaches as RDSO modification sheet No (i) : RDSO/PE/MS/AC/0089(Rev 0-2022, Dated: 06.02.2023 for Differential Pressure switch, (ii) RDSO/PE/MS/AC/0087(Rev.0)/2022, Dated 07.06.2022 for NTC sensor, for LHB AC coaches of IZN Division.
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - Removal and cleaning of CTRBs of BG wagon wheel sets (As per Scope of Work)