Items - Construction of station buildings, covering shed, Passenger/Goods platform passenger amenities, Foot Over Bridge, construction of service buildings of Elect./S&T structures, staff quarters, circulating area, RCC Road, RCC Over Head Tank, yard drain and other misc. works at proposed LOTNA station (B-class) in connection with gauge conversion between MYG-DB-SMLA GC (96.46Km) Project on Vadodara Division of Western Railway.
Items - Annual Zone Work for maintenance of staff qtrs and service building in branch line JHI-SNP section under SSE/W/JHI.
Items - "Supply and application of Interior vinyl Graphics RDSO Specification No. RDSO/2010/CG-08 on lavatories inside wall panels, gangway and doorway panels, Flap door arrangement of Water Tank and switch board panels in compartment. Make only from M/s 3M India Limited or M/s Avery Dennison ICF coaches at Motibagh Workshop Nagpur as per scope of work".
Items - CCG-VR section - Virar Carshed - Proposal for outsourcing maintenance of new assets in VR carshed for a period of two years.
Items - AMC for EFFTRONICS make Datalogger (89 Nos) & RTU (121Nos) at Stations/LCs in Madurai Division for a period of 3 Years
Items - Re-Certification of IMS (ISO 9001:2015, 14001:2015 and OHSAS 45001:2018) at Mechanical Workshop Izatnagar (As per scope of work) for period of 38 months.
Items - Comprehensive Annual Maintenance Contract of Hitachi Make EI system for Signaling interlocking in CNB-BDN section of Sr. DSTE/CNB, Prayagraj Division for a period of Thirty Six Months.
Items - Signalling work in Connection with provision of TTR(TWS)1:12 (Total 142 Sets) in RPC Section and provision of TTR & TTSR(Through Turn Out Sleeper Renewal) with 60 KG PRC Sleepers of P&C of 1:12 (8 Nos) and 1:8.5 (9 Nos) in Jaipur-Bandikui Section of Jaipur division.
Items - Raipur Division - Bilaspur-Durg - TBR - 62.542 Tkm under the jurisdiction of ADEN/I/Bhilai & Raipur-Lakholi-TBR - 7.072 Tkm under the jurisdiction of ADEN/Track/Raipur
Items - Dadar :- Repairs to platform surfacing on platform no.5/6 at Dadar station on urgent basis.
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - Improvement of water supply by provision of chlorination plant at new pump house in the colonies for 5 years under ADEN/HQ/II/CNB.
Items - SCR Construction Organization- Secunderabad Division- Proposed Junction arrangements at Parli vaijnath station in connection with Doubling of Parbhani- Parli stations, Bypass line at Parli yard and connectivity of new line of Ahmed Nagar- Beed-Parlivaijnath at Parli yard: Execution of additional works of earth work in formation, Construction of minor bridges, Construction of Goomties, collection of Ballast, transportation of P.Way materials, laying and linking of track and other connected miscellaneous works etc.at Parli yard
Items - Schedule A- Provision of IBH at Adalpahari Station in between Rampurhat - Pinatgaria Section of HWH division. Schedule B-Provision of Signalling Cost for IBH at Barmasia Station in between Sikaripara - Kurva Section of HWH.
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - Providing and erecting "W" metal cattle barrier along the track to prevent CRO in Jhansi - Kanpur section.
Items - Request for Proposal for Jeypore -Navarangpur New Railway Line project: Construction of New BG Railway Line Between Ambaguda(Excluding) (13.60 Km) to Navarangpur (Including) (44.14 Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(Excluding Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, Modification/ Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc on EPC Basis in Waltair Division of East Coast Railway on Engineering, Procurement & Construction (EPC) Mode.
Items - Metallizing,painting,steel structure of elevated road at Dadar and FOB's between Churchgate -Khar section.
Items - (1) MACLS Outdoor and Indoor works in connection with provision of Distributed Electronic Interlocking at Guntakal West Station (2) MACLS Outdoor and Indoor works (Alteration to existing Kyosan make EI) at Mallappa Gate station and (3) Shifting of S&T gears at Guntakal West Station (from km.0.00 to km. 2.00) & Mallappa Gate station (from km.8.10 to km. 9.64).
Items - Reliability improvement of interlocked LC gate by providing Slide Boom in Sealdah Division.