Items - SWR-SBC Division-Converting of existing Pilgrim siding (Rd-4) as common Loop at SSPN Station, TMS siding at SSPN and MSDAC work at SSPN of Bangalore Division.
Items - In-Situ Reconditioning of CMS Crossing using Robotic Welding Machine in DEN/North Jurisdiction.
Items - Raipur Division - Bilaspur-Durg - TBR - 62.542 Tkm under the jurisdiction of ADEN/I/Bhilai & Raipur-Lakholi-TBR - 7.072 Tkm under the jurisdiction of ADEN/Track/Raipur
Items - Raipur Division - Bilaspur-Durg - TBR - 65.499 Tkm under the jurisdiction of ADEN/Bhatapara.
Items - Annual maintenance contract (AMC) for carrying out servicing including checking, repairing and maintenance of USFD machines working over Raipur Division and also for the supply of spare parts for a period of two years.
Items - At NGC - Provision of solar plant by covering the Roof Top of Various staff quarters and LC gates in NGC area.
Items - Comprehensive Annual Maintenance Contract of Hitachi Make EI system for Signaling interlocking in CNB-BDN section of Sr. DSTE/CNB, Prayagraj Division for a period of Thirty Six Months.
Items - Replacement of corroded top flange plate, corroded members, corroded chequared plate at Br.No.260 (1x12.20m+2x18.30m Plate girder), Br.No.261 (3x18.30m Plate girder), Br.No.292 (2x18.30m plate girder)Br.No.306 (1x18.30m Plate girder), Br.No.309 (1x12.20m+2x18.30m), Br.No.322 (1x9.15m), Br.No.593 (3x12.19m), Br.No.597 (4x45.72m+8x24.40m) and replacement of corroded rivtes in HAS-MAJN section (including SKLR-SBHR ghat section) in SSE/Bridges/SKLR jurisdiction.
Items - Augmentation of Electrical asset and other ancillary work in all running room, rest room, crew lobby over ASN DIVN(Phase-I).
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - Signalling work in Connection with provision of TTR(TWS)1:12 (Total 142 Sets) in RPC Section and provision of TTR & TTSR(Through Turn Out Sleeper Renewal) with 60 KG PRC Sleepers of P&C of 1:12 (8 Nos) and 1:8.5 (9 Nos) in Jaipur-Bandikui Section of Jaipur division.
Items - Request for Proposal for Jeypore -Navarangpur New Railway Line project: Construction of New BG Railway Line Between Ambaguda(Excluding) (13.60 Km) to Navarangpur (Including) (44.14 Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(Excluding Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, Modification/ Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc on EPC Basis in Waltair Division of East Coast Railway on Engineering, Procurement & Construction (EPC) Mode.
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - Painting of steel structures due for painting during the year 2024-25 under SSE/Br/MYS section.
Items - At PNO : Provision of Solar Plant by covering the Roof Top of Various Staff quarters in PNO Area.
Items - Renovation of catwalk no. 06 of NCC coaching yard, Sealdah.
Items - Removal and cleaning of CTRBs of BG wagon wheel sets (As per Scope of Work)
Items - Improvement of water supply by provision of chlorination plant at new pump house in the colonies for 5 years under ADEN/HQ/II/CNB.
Items - "Radiography Test of Welded Test plate for a period of three (03) years from BARC/AERB approved outside agency on open tender basis."