Items - "Radiography Test of Welded Test plate for a period of three (03) years from BARC/AERB approved outside agency on open tender basis."
Items - At NGC - Provision of solar plant by covering the Roof Top of Various staff quarters and LC gates in NGC area.
Items - AMC for EFFTRONICS make Datalogger (89 Nos) & RTU (121Nos) at Stations/LCs in Madurai Division for a period of 3 Years
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - Request for Proposal for Jeypore -Navarangpur New Railway Line project: Construction of New BG Railway Line Between Ambaguda(Excluding) (13.60 Km) to Navarangpur (Including) (44.14 Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(Excluding Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, Modification/ Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc on EPC Basis in Waltair Division of East Coast Railway on Engineering, Procurement & Construction (EPC) Mode.
Items - Augmentation of Electrical asset and other ancillary work in all running room, rest room, crew lobby over ASN DIVN(Phase-I).
Items - Removal and cleaning of CTRBs of BG wagon wheel sets (As per Scope of Work)
Items - Comprehensive Annual Maintenance Contract of Hitachi Make EI system for Signaling interlocking in CNB-BDN section of Sr. DSTE/CNB, Prayagraj Division for a period of Thirty Six Months.
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - Raipur Division - Bilaspur-Durg - TBR - 62.542 Tkm under the jurisdiction of ADEN/I/Bhilai & Raipur-Lakholi-TBR - 7.072 Tkm under the jurisdiction of ADEN/Track/Raipur
Items - In-Situ Reconditioning of CMS Crossing using Robotic Welding Machine in DEN/North Jurisdiction.
Items - Comprehensive contract for modification of coaches as RDSO modification sheet No (i) : RDSO/PE/MS/AC/0089(Rev 0-2022, Dated: 06.02.2023 for Differential Pressure switch, (ii) RDSO/PE/MS/AC/0087(Rev.0)/2022, Dated 07.06.2022 for NTC sensor, for LHB AC coaches of IZN Division.
Items - At PNO : Provision of solar plant by covering the roof Top of various service buildings , Railway station, Parking area in PNO area.
Items - Annual maintenance contract (AMC) for carrying out servicing including checking, repairing and maintenance of USFD machines working over Raipur Division and also for the supply of spare parts for a period of two years.
Items - (1) MACLS Outdoor and Indoor works in connection with provision of Distributed Electronic Interlocking at Guntakal West Station (2) MACLS Outdoor and Indoor works (Alteration to existing Kyosan make EI) at Mallappa Gate station and (3) Shifting of S&T gears at Guntakal West Station (from km.0.00 to km. 2.00) & Mallappa Gate station (from km.8.10 to km. 9.64).
Items - Bilaspur-Durg - CTR(S) - 13.393 Tkm & Raipur-Lakholi - CTR(S) - 18.659 Tkm.
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - "Supply and application of Interior vinyl Graphics RDSO Specification No. RDSO/2010/CG-08 on lavatories inside wall panels, gangway and doorway panels, Flap door arrangement of Water Tank and switch board panels in compartment. Make only from M/s 3M India Limited or M/s Avery Dennison ICF coaches at Motibagh Workshop Nagpur as per scope of work".
Items - At PNO : Provision of Solar Plant by covering the Roof Top of Various Staff quarters in PNO Area.
Items - Improvement of water supply by provision of chlorination plant at new pump house in the colonies for 5 years under ADEN/HQ/II/CNB.