Items - Provision of Safety fencing along the track for running of trains in Gurudijhatia - Talcher Road section under the jurisdiction of ADEN/Dhenkanal of Khurda Road Division.
Items - Comprehensive Annual Maintenance Contract of Hitachi Make EI system for Signaling interlocking in CNB-BDN section of Sr. DSTE/CNB, Prayagraj Division for a period of Thirty Six Months.
Items - At Basuldanga(BSD)-Provision of FOB in connection with the sanction work PB-ER-18-19(706)
Items - CCG-VR section - Virar Carshed - Proposal for outsourcing maintenance of new assets in VR carshed for a period of two years.
Items - Construction of station buildings, covering shed, Passenger/Goods platform passenger amenities, Foot Over Bridge, construction of service buildings of Elect./S&T structures, staff quarters, circulating area, RCC Road, RCC Over Head Tank, yard drain and other misc. works at proposed LOTNA station (B-class) in connection with gauge conversion between MYG-DB-SMLA GC (96.46Km) Project on Vadodara Division of Western Railway.
Items - SWR-SBC Division-Converting of existing Pilgrim siding (Rd-4) as common Loop at SSPN Station, TMS siding at SSPN and MSDAC work at SSPN of Bangalore Division.
Items - Raipur Division - Bilaspur-Durg - TBR - 62.542 Tkm under the jurisdiction of ADEN/I/Bhilai & Raipur-Lakholi-TBR - 7.072 Tkm under the jurisdiction of ADEN/Track/Raipur
Items - In-Situ Reconditioning of CMS Crossing using Robotic Welding Machine in DEN/North Jurisdiction.
Items - Provision / improvement of Amenities (other than FOB) for Divyangjan at the station as per new guidelines by the Railway Board under the jurisdiction of Divisional Engineer (North) Jabalpur
Items - Comprehensive contract for modification of coaches as RDSO modification sheet No (i) : RDSO/PE/MS/AC/0089(Rev 0-2022, Dated: 06.02.2023 for Differential Pressure switch, (ii) RDSO/PE/MS/AC/0087(Rev.0)/2022, Dated 07.06.2022 for NTC sensor, for LHB AC coaches of IZN Division.
Items - At PNO : Provision of solar plant by covering the roof Top of various service buildings , Railway station, Parking area in PNO area.
Items - Annual maintenance contract (AMC) for carrying out servicing including checking, repairing and maintenance of USFD machines working over Raipur Division and also for the supply of spare parts for a period of two years.
Items - (1) MACLS Outdoor and Indoor works in connection with provision of Distributed Electronic Interlocking at Guntakal West Station (2) MACLS Outdoor and Indoor works (Alteration to existing Kyosan make EI) at Mallappa Gate station and (3) Shifting of S&T gears at Guntakal West Station (from km.0.00 to km. 2.00) & Mallappa Gate station (from km.8.10 to km. 9.64).
Items - Reliability improvement of interlocked LC gate by providing Slide Boom in Sealdah Division.
Items - At MLG (HQ) Division -(Part A) Provision of 1733 KWp Grid connected rooftop Solar Power plant including 5 years AMC/CAMC at rooftop of Service building & residential buildings in Goshala & Nambari Area.
Items - Bilaspur-Durg - CTR(S) - 13.393 Tkm & Raipur-Lakholi - CTR(S) - 18.659 Tkm.
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - "Supply and application of Interior vinyl Graphics RDSO Specification No. RDSO/2010/CG-08 on lavatories inside wall panels, gangway and doorway panels, Flap door arrangement of Water Tank and switch board panels in compartment. Make only from M/s 3M India Limited or M/s Avery Dennison ICF coaches at Motibagh Workshop Nagpur as per scope of work".
Items - At PNO : Provision of Solar Plant by covering the Roof Top of Various Staff quarters in PNO Area.
Items - Improvement of water supply by provision of chlorination plant at new pump house in the colonies for 5 years under ADEN/HQ/II/CNB.