Items - Complete Track Renewal 11.85 Kms manually on loop lines, Through Rail Renewal 20.40 Km and Through Ballast Renewal 0.71 Km on Satna - Manikpur section under Divisional Engineer (North) Jabalpur Jurisdiction.
Items - Asarva- Electrical work in connection with provision of air conditioning in office of the Sr. DSTE/ADI.
Items - Modification and Refurbishing of flameless pantry in ICF type RA Coach in Mechanical Workshop, Gorakhpur.
Items - Execution of various P-Way works in the section between Koraput (ex) to Singapur Road (ex) stations under the jurisdiction of Assistant Divisional Engineer/Lakshmipur Road on Koraput - Rayagada Line of Waltair Division.
Items - MAQ - Yard re-modelling for provision of stabling line, extn of PFs and pit lines from 22 to 24 LHB capacity and slewing/realignment of yard lines - Electrical Arrangements
Items - Modification to the existing OHE in connection with the extension of lines by 100m each in DN Yard R&D at Igatputi Titoli Yard in Mumbai Division of Central Railway.
Items - Supply of potable water and cleaning of Overhead water tank for 2 years at office cum Kohima officer's Rest House cum Transit Room cum Subordinate Rest house in Dimapur-Kohima New BG Railway Line Project.
Items - Provision of Goods Platform and circulating area at Rahmatpur station including construction of yard drain,boundary wall and approach road and platform surfacing work at Arariya Court ,Rahmatpur,Bansbari,Khawaspur and Laxmipur Yard,protection works and other Misc. Work from Arariya (0.00KM) to Laxmipur(26.00 KM) in connection with Arariya - Galagalia New BG Line Project of N.F. Railway (Construction) under jurisdiction of DY.CE/C-II/KIR.
Items - Through Rail Renewal 30.623 Km and Through Fitting Renewal 52.40 Km on Katni - Satna section under Divisional Engineer (North) Jabalpur Jurisdiction.
Items - Providing Project Management Services for the Provision of Automatic Block Signalling with associated Signalling and Telecom arrangement along with associated civil/track and electrical works for provision of automatic signalling in UP and DN LINES OF ITRARSI-KATNI section of JABALPUR Division, West Central Railway
Items - Construction of Office cum Barrack at Lonand (Electrical Gen. Work).
Items - Construction of 1 No. Road Over Bridge (ROB-Composite Girder) & 2 Nos. Road Over Bridges (ROB-RCC Box) including substructure, Superstructure, RE Wall construction in approaches, Road work and other miscellaneous works in Panna-Khajuraho section (Km 74.550-80.00 and Km 105.00-130.00) in connection with Panna-Khajuraho New BG Rail Line Project.
Items - Electrical TRD portion of work in connection with interlocking of LC gate No. 47 at Kms 500/4-5 between Dhoki-Ausa Road section and LC 06 at Kms 552/1-2 in Kurduwadi-Latur Road section of Solapur Division.
Items - Up-gradation of Power supply system by replacing overhead conductors and other accessories at different stations over Dhanbad division.
Items - Construction of Cast-in-situ box tunnel in rock falling location in between Ch. 7.660 Km to Ch. 7.890 Km from Hansdiha and making suitable diversion line in connection with new BG line between Hansdiha and Godda.
Items - Overhauling of transmission of TW No.RU 98876 of KJT Depot and PTL-15 of IGP Depot of Kalyan & Lonavala districts of Mumbai Division .
Items - Laying and linking of Broad Gauge main Line, including points and crossings, spreading of Ballast, tamping of track, transportation of P.Way Materials and other ancillary works from Singawal (Excluding) Km 53/3 to Raila Road (Including) Km 99/0 in connection with Ajmer-Chanderiya doubling project of North Western Railway.
Items - ASN DIVN- Provision of HMT(High Mast Tower) light in approach road of station, loading point and yard over ASN DIVN.
Items - PWL - JHS :- Comprehensive annual maintenance contract of Mobile Train Radio Communication (MTRC) system for a period 24 Months.
Items - Design, Supply, Erection, Testing & Commissioning of feeder line, AEC & BEC in connection with upgradation of 1x25KV traction system to 2X25 kV traction system and Design, Supply, Erection, Testing & Commissioning of 2x25 scott connected 132/25 KV Traction Sub station, Sectioning post (SPs), and Sub sectioning post (SSPs) between CTC-RJGR-TLHR-ANGL and BRAG-RJGR (Excl CTC-NRG and BRAG) section of Khurda Road division of East Coast Railway as a composite Electrical work to meet 3000MT loading target. [151RKM/556TKM TSS- 3No (4L), SP- 05 Nos(4L), and SSP-07 Nos (4L) ]