Items - Comprehensive AMC for Kyosan make Electronic Interlocking at 07 nos. Stations (including 02 no. IBH) in BSB division for a period of two years.
Items - P Way works for track maintenance of Sudamdih(SDMD) siding.
Items - Bhavnagar Division TRR(P)20.808 TKM on major and important bridges.
Items - Supply, erection, testing & commissioning of 50Hz single phase 25KV AC OHE in connection with provision of slewing of OHE for construction of new Foot Over Bridge at Sahebtala Halt Station in between BDC-KWAE section in Howrah Division of Eastern Railway.
Items - Outsourcing of Non-core activity for cleaning of batteries, light fittings, fans, switches, sockets, exhaust fans etc, for Non-AC, ICF & LHB coaches at Train Lighting Maintenance Depots over Hubballi division for two years.
Items - Bangalore - Mysore Section: Complete Track Renewal (CTR(P)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in SSE/P.Way/Kengeri section.
Items - Removal of muck/malba or similar materials in Barabanki yard etc in the section of ADEN-II/LKO.
Items - Installation of "Grid Connected" (On Grid) Solar Photo Voltaic Modules at Katihar Division. (Phase-I).
Items - Zonal works i.e. execution of (a) new work additions, alterations to the existing structures, special repair works and supply of building materials subject to costing of each such work not exceeding rupees 5 lakh and (b) all works ordinary repair and maintenance works upto 30.06.2026 for maintenance of Service buildings, Staff quarters and colony under the jurisdiction of SSE(Works)/BKSC except water supply.
Items - Track maintenance work after doubling of section ABP-SLW under ADEN-AYC
Items - Electrical work in c/w Extension of Platform shelter and Replacement of precast platform coping stones in platform of Udhampur Railway Station on JAT-SVDK section.
Items - Bengaluru: Re-construction of pit line 3 at Bangalore city yard duly dismantling the existing pit line 3 as per CAMTECK design with cat walk. Maintenance period is 4months
Items - Miscellaneous track maintenance works in the section of SSE/P.Way/LBA under ADEN/II-SLN in the jurisdiction of Sr. DEN-IV/LKO
Items - Zonal works i.e. execution of (a) new work additions, alterations to the existing structures, special repair works and supply of building materials subject to costing of each such work not exceeding rupees 5 lakh and (b) all works ordinary repair and maintenance works upto 30.06.2026 for maintenance of Service buildings, Staff quarters and colony under the jurisdiction of SSE(Works)/MAHUDA in Adra Division.
Items - Hyderabad Division: (1) Replacement of Mechanically Operated Lifting Barrier (MOLB) with Electrically Operated Lifting Barrier (EOLB) at 9 Nos. of LC Gate Nos.190A, 191, 193, 219, 228, 60, 60A,61 & 127. (2) SC-DHNE Section: Elimination of Manned LC Gate No. 68 at Km No. 126/500-600 by providing RUB between MBNR-MQN Stations, (3) SC-DHNE Section: Elimination of Manned LC Gate No. 138 at Km No. 253/100-200 by providing RUB between KRNT-DUU Stations, (4) SC-MUE Section: Proposal for Construction of Ancillary work like Cover Over Approaches, Humps at Approaches and RCC Wall/LHS at existing RUB Bridge No. 19/A, LC No. 6 JB, (5) SC-MUE Section : RUB Bridge No. 85/A, LC No.18, (6) SC-MUE Section : RUB Bridge No. 127/A, LC No.26, (7) SC-MUE Section : RUB Bridge No. 201/A, LC No. 49, (8) SC-MUE Section : RUB Bridge No. 252A, LC No. 62, (9) SC-MUE Section : RUB Bridge No. 260A, LC No. 63, (10) SC-MUE Section : RUB Bridge No. 382/A, LC No. 163, (11 SC-MUE Section : RUB Bridge No. 422/A, LC No. 177, (12) SC-MUE Section : RUB Bridge No.435/B2, LC No. 119, (13) SC-MUE Section : RUB Bridge No. 482/1A, LC No. 192A, (14) SC-MUE Section : RUB Bridge No. 483, LC No. 194, (15) SC-MUE Section: RUB Bridge No. 500/A, LC No. 157 & (16) SC-MUE Section: RUB Bridge No. 695/A, LC No. 242 - Signal & Telecom arrangements
Items - Zonal works i.e. execution of (a) new work additions, alterations to the existing structures, special repair works and supply of building materials subject to costing of each such work not exceeding rupees 5 lakh and (b) all works ordinary repair and maintenance works upto 30.06.2026 for maintenance of Service buildings, Staff quarters and colony at Bhojudih and Bhaga under the jurisdiction of SSE(Works)/BHOJUDIH in Adra Division.
Items - Sub Work 1: Bannihatti - Provision of sand hump on Rd-1 towards Ranjitpura and overshoot line on Road No. 1 towards Tornagallu end. Sub work 2: SWR: UBL Division - Rewiring of point group relay configuration from 12F/4B to 8F/8B and Provision of Sun board of CT rack Particulars, "P" rack particulars and Power rack particulars at Relay room and Equipment room over Hubballi Division.
Items - Installation of "Grid Connected" (On Grid) Solar Photo Voltaic Modules at Katihar Division. (Phase-II).
Items - AYC :- Repair to new station building at Ayodhya Dham Station in the section of SSE-W-AYC under ADEN-AYC.
Items - Provision for repairs to bridges in SLN-UTR (ex.) section under ADEN-SLN-I in the Jurisdiction of Sr. DEN-IV-LKO.