Items - Comprehensive Annual Maintenance Contract of MEDHA make Electronic Interlocking systems installed at various stations of Bhopal Division for a Period of 36 Months.
Items - Outsourcing of ROH & Sick-line works at wagon repair depot/ Jhansi for a period of 02 years
Items - Track maintenance work after doubling of section ABP-SLW under ADEN-AYC
Items - Comprehensive AMC of Omega make passenger lifts for period of 3 years in Pune Division- 8 Nos
Items - Zonal works i.e. execution of (a) new work additions, alterations to the existing structures, special repair works and supply of building materials subject to costing of each such work not exceeding rupees 5 lakh and (b) all works ordinary repair and maintenance works upto 30.06.2026 for maintenance of Service buildings, Staff quarters and colony under the jurisdiction of SSE(Works)/BKSC except water supply.
Items - Sub Work 1: Bannihatti - Provision of sand hump on Rd-1 towards Ranjitpura and overshoot line on Road No. 1 towards Tornagallu end. Sub work 2: SWR: UBL Division - Rewiring of point group relay configuration from 12F/4B to 8F/8B and Provision of Sun board of CT rack Particulars, "P" rack particulars and Power rack particulars at Relay room and Equipment room over Hubballi Division.
Items - Improvement to Vasind & Titwala Yard under SSE P.Way VSD.
Items - Installation of "Grid Connected" (On Grid) Solar Photo Voltaic Modules at Katihar Division. (Phase-I).
Items - Provision for installation of ISI marked PVC pipes of 120mm outer diameter/103.5 mm inner diameter of various lengths to prevent bird nesting Over Danapur division.
Items - Bangalore - Mysore Section: Construction of RRM drain and ballast retaining wall 1000m in connection with the work of Complete Track Renewal (CTR(P)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in SSE/P.Way/KGI section. Maintenance period is 6 months or one monsoon period whichever is later
Items - A) Rendering services for maintenance work including supply of materials for Railway Quarters at Kolsewadi under SSE (W)KYN for 12 months. B) Rendering services and supply of materials for maintenance of Railway Quarters under SSE (Wks) Waldhuni and Gate 41 for 12 months under ADEN(W)KYN.
Items - Complete Re-wiring of quarters and colonies at Rangiya (100 Quarters/ Buildings).
Items - Miscellaneous track maintenance works in the section of SSE/P.Way/II/SLN under ADEN/II-SLN in the jurisdiction of Sr. DEN-IV/LKO
Items - P Way works for track maintenance of Sudamdih(SDMD) siding.
Items - Proposal for carrying out repairs to VHF sets of Motorola GP 328(5W)-600Nos pertaining to BZA Division.
Items - Outsourcing of Non-core activity for cleaning of batteries, light fittings, fans, switches, sockets, exhaust fans etc, for Non-AC, ICF & LHB coaches at Train Lighting Maintenance Depots over Hubballi division for two years.
Items - Resurfacing of Platforms and augmenting of amenities for Divyagjan at VLU, NVL, NPM and VDL stations (NSG-6).
Items - Supply, erection, testing & commissioning of 50Hz single phase 25KV AC OHE in connection with provision of slewing of OHE for construction of new Foot Over Bridge at Sahebtala Halt Station in between BDC-KWAE section in Howrah Division of Eastern Railway.
Items - A)Misscellaneous P. way for the year 2024-25 in SSE/P/Way (MNKD) section under ADEN(M) MNKD. B)Replacement of 52kg 05 nos. of DDS replaced by 60 kg DDS in Wadibunder & Mazgaon yard. (Project ID- 01.02.31.22.4.51.024) C) Replacement of 05 nos. 52 kg Scissor Crossover WB Yard - 03 nos. & SNDP Carshed-02 nos. replaced by 60 kg scissor Cross over. (Project ID- 01.02.31.22.4.51.023)
Items - Bhojudih- Development of ROH facilities at BJE in Adra Division of South Eastern Railway.