Items - Sub Work 1: Bannihatti - Provision of sand hump on Rd-1 towards Ranjitpura and overshoot line on Road No. 1 towards Tornagallu end. Sub work 2: SWR: UBL Division - Rewiring of point group relay configuration from 12F/4B to 8F/8B and Provision of Sun board of CT rack Particulars, "P" rack particulars and Power rack particulars at Relay room and Equipment room over Hubballi Division.
Items - Improvement to Vasind & Titwala Yard under SSE P.Way VSD.
Items - Installation of "Grid Connected" (On Grid) Solar Photo Voltaic Modules at Katihar Division. (Phase-I).
Items - Provision for installation of ISI marked PVC pipes of 120mm outer diameter/103.5 mm inner diameter of various lengths to prevent bird nesting Over Danapur division.
Items - DEN/South/SBC sec : Cess repair/widening work in connection with the work of (a) SBC-SA sec : Complete Track Renewal (P) of existing 52kg rails on 52kg PSC of 1540 nos/km with 60 kg/90 UTS rails and 60kg wider base sleeper of 1660/km for a length of 15.5 km from km 66/500-72/0 and 77/0-87/00 (SL) in ADEN/DPJ section. (b) BAW-HAS : Through Ballast Recoupment for a length of 110km from km 14/000-124/000 (SL). Maintenance period is 6 months or one monsoon period whichever is later.
Items - Bangalore - Mysore Section: Construction of RRM drain and ballast retaining wall 1000m in connection with the work of Complete Track Renewal (CTR(P)) of existing 52kg rails with 60kg for a length of 28.30kms from 13/500-30/000 and 31/800 - 43/600 up line in SSE/P.Way/KGI section. Maintenance period is 6 months or one monsoon period whichever is later
Items - A) Rendering services for maintenance work including supply of materials for Railway Quarters at Kolsewadi under SSE (W)KYN for 12 months. B) Rendering services and supply of materials for maintenance of Railway Quarters under SSE (Wks) Waldhuni and Gate 41 for 12 months under ADEN(W)KYN.
Items - Complete Re-wiring of quarters and colonies at Rangiya (100 Quarters/ Buildings).
Items - Miscellaneous track maintenance works in the section of SSE/P.Way/II/SLN under ADEN/II-SLN in the jurisdiction of Sr. DEN-IV/LKO
Items - P Way works for track maintenance of Sudamdih(SDMD) siding.
Items - Proposal for carrying out repairs to VHF sets of Motorola GP 328(5W)-600Nos pertaining to BZA Division.
Items - Maintenance of Santragachi(SRC) Running Room which includes Preparation & Serving of Subsidized and Personal Ration Meal to the Occupants, Distribution of Linens with Caretaking, Cleaning of Running Room, Washing of Linens, Gardening etc by outside agencies for a period of 2 years i.e 730 days.
Items - Outsourcing of Non-core activity for cleaning of batteries, light fittings, fans, switches, sockets, exhaust fans etc, for Non-AC, ICF & LHB coaches at Train Lighting Maintenance Depots over Hubballi division for two years.
Items - At APDJ division: - Comprehensive Annual Maintenance of Split/Window, Cassette, Duct & Centralize type RAC and water cooler for a period of 02 years.
Items - Resurfacing of Platforms and augmenting of amenities for Divyagjan at VLU, NVL, NPM and VDL stations (NSG-6).
Items - Provision of LTE (Long Term Evolution) based MTRC (Mobile Train Radio Communication) system over New Delhi-Howrah route (including Kanpur-Lucknow section) of Indian Railways
Items - Supply, erection, testing & commissioning of 50Hz single phase 25KV AC OHE in connection with provision of slewing of OHE for construction of new Foot Over Bridge at Sahebtala Halt Station in between BDC-KWAE section in Howrah Division of Eastern Railway.
Items - A)Misscellaneous P. way for the year 2024-25 in SSE/P/Way (MNKD) section under ADEN(M) MNKD. B)Replacement of 52kg 05 nos. of DDS replaced by 60 kg DDS in Wadibunder & Mazgaon yard. (Project ID- 01.02.31.22.4.51.024) C) Replacement of 05 nos. 52 kg Scissor Crossover WB Yard - 03 nos. & SNDP Carshed-02 nos. replaced by 60 kg scissor Cross over. (Project ID- 01.02.31.22.4.51.023)
Items - Bhojudih- Development of ROH facilities at BJE in Adra Division of South Eastern Railway.
Items - Electrical work in connection with Provision of 12 Mtr. wide FOB at Badshahnagar, Sitapur, Bahraich and Lakhimpur Railway Stations of Lucknow Division under Amrit Bharat Station Scheme.