Items - Emergency light,Landing door guide shoe,Coated steel belt,Car top sheave Car guide shoe gips,PCB BCB Gen 2 ARO,Air Cord,Power supply,Handrail Sheave,Escalator stop key panel,Buffer ring,PCB GCSECB 508NCE ESC w MESB,Brake solenoid,Step sensor,NEWEL bearing 34 sction chain,escalator handrail belt,Handrail drive chain for XOP MOD,Break Arm FTJ,Key box upper landing outdoor,tension roller,ESC safe switch,Motor proximity switch sensor,Contactor,ball bearing,Contact piezo magnetic switch,Compression roller,Protective guard 3 PCS NCE506,Right sided bond of pallets,ESC bearing,Left sided bond of pallets
Items - Supply of UV/IR Detector testing Kit
Items - Fabric for Summer Uniform (Pant, Shirt & Salwar-suit with dupatta)
Items - 50mm, PN16, CI body and DI disc without flange lever operated butterfly valve,100mm, PN16, CI body and DI disc without flange lever operated butterfly valve,100mm NRV without flange type, PN 16,50mm NRV without flange type, PN 16,Supply of High Torque valve actuator, model no. SQL36E110 etc AS PER SPECIFICATION,Installation alongwith the BMS configration, testing and commissioning of above valve,6mm dia and 6 inch long, full thread brass coated bolt with nut and washer,4mm dia and 6 inch long full thread brass coated bolt with nut and washer
Items - E - Cart for Garbage (V2)
Items - Tricycle Or Rickshaw
Items - File Cabinet,4 set Drawer,1 set Lock,Channel set,Palusole Strip set
Items - Mobile Power Generation Module,Magnetic Bd MAP,Renovation of Ops Room Backlit Maps,Calculator,Lamy Ink,Pen Stand
Items - E - Cart for Garbage (V2)
Items - Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Earth Moving Equipment; Shrub Harvester; 5 to 10 years,Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Earth Moving Equipment; Shrub Harvester; 5 to 10 years,Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Earth Moving Equipment; Shrub Harvester; 5 to 10 years,Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Crane; Crane above 6 meter; 5 to 10 years,Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Crane; Crane above 6 meter; 5 to 10 years,Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Crane; Crane above 6 meter; 5 to 10 years,Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Earth Moving Equipment; Poklane; 5 to 10 years,Hiring of Earth Moving Equip
Items - Windows 11 Professional pro 23H2,Windows 10 Professional pro 22H2,Microsoft office 2021,Quick Heal Total Security,Pdf reader for Windows 11
Items - Tricycle Or Rickshaw
Items - Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Theme Based Events; Participation arrangements; Third-party premise; FOUR DAY
Items - Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Earth Moving Equipment; Tractor+Trailers; 5 to 10 years
Items - Event or Seminar or Workshop or Exhibition or Expo Management Service - National; Theme Based Events; Participation arrangements; Third-party premise; FOUR DAY
Items - Emergency Foldable Rescue Stretcher
Items - Life Buoy (V2) as per IS 5326
Items - Megaphone-Loud Hailer
Items - Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Earth Moving Equipment; JCB; 5 to 10 years
Items - Copper wire,Bty Lead Terminal,Diode for genr,Bearing,MS Square Pipe,MS Square Pipe,MS Square Pipe,MS Square Pipe,Feviquick tube,M Seal,Solder soft