Items - Replacement of corroded top flange plate, corroded members, corroded chequared plate at Br.No.260 (1x12.20m+2x18.30m Plate girder), Br.No.261 (3x18.30m Plate girder), Br.No.292 (2x18.30m plate girder)Br.No.306 (1x18.30m Plate girder), Br.No.309 (1x12.20m+2x18.30m), Br.No.322 (1x9.15m), Br.No.593 (3x12.19m), Br.No.597 (4x45.72m+8x24.40m) and replacement of corroded rivtes in HAS-MAJN section (including SKLR-SBHR ghat section) in SSE/Bridges/SKLR jurisdiction.
Items - Bilaspur-Durg - CTR(S) - 13.393 Tkm & Raipur-Lakholi - CTR(S) - 18.659 Tkm.
Items - Construction of station buildings, covering shed, Passenger/Goods platform passenger amenities, Foot Over Bridge, construction of service buildings of Elect./S&T structures, staff quarters, circulating area, RCC Road, RCC Over Head Tank, yard drain and other misc. works at proposed LOTNA station (B-class) in connection with gauge conversion between MYG-DB-SMLA GC (96.46Km) Project on Vadodara Division of Western Railway.
Items - At MLG (HQ) Division -(Part A) Provision of 1733 KWp Grid connected rooftop Solar Power plant including 5 years AMC/CAMC at rooftop of Service building & residential buildings in Goshala & Nambari Area.
Items - At PNO : Provision of solar plant by covering the roof Top of various service buildings , Railway station, Parking area in PNO area.
Items - "Supply and application of Interior vinyl Graphics RDSO Specification No. RDSO/2010/CG-08 on lavatories inside wall panels, gangway and doorway panels, Flap door arrangement of Water Tank and switch board panels in compartment. Make only from M/s 3M India Limited or M/s Avery Dennison ICF coaches at Motibagh Workshop Nagpur as per scope of work".
Items - Dadar :- Repairs to platform surfacing on platform no.5/6 at Dadar station on urgent basis.
Items - Design, Supply, Erection, Testing & Commissioning of 25 KV AC OHE work under Dahod Yard Modification work in connection with new line work between Dahod - Indore, of Ratlam Division, Western Railway
Items - Raipur Division - Bilaspur-Durg - TBR - 65.499 Tkm under the jurisdiction of ADEN/Bhatapara.
Items - Providing inspection platform for abutments and piers of bridge No.242A RUB span 1X12.2m(3 track), 222A RUB span 1X12.20m, 192D RUB span 1X1S.10m(2 track), 131 RUB span 1X12.20m, Br.No.1 10Dn line span 1X18.30m,Br No.86 span 3X12.20m, Br.No.85 span 2X12.20, Br No.71 span 2X12.20m, Br.No.50 span 2X12.20m, Br.No.35 span 3X12.20m, Br.NO@ 46"10@span 1X12.20m, Br.No.23 span 1X12.20m, Br.No.21 span 1X12.20m,Br.No.69 span 1X12.20m, Br.No.51 span 2X12.20m,Br.No.50 span 2X12.20m & Br.No.44 span 1X12.20m+1X18.30m.(total 17 Bridges)
Items - SCR Construction Organization- Secunderabad Division- Proposed Junction arrangements at Parli vaijnath station in connection with Doubling of Parbhani- Parli stations, Bypass line at Parli yard and connectivity of new line of Ahmed Nagar- Beed-Parlivaijnath at Parli yard: Execution of additional works of earth work in formation, Construction of minor bridges, Construction of Goomties, collection of Ballast, transportation of P.Way materials, laying and linking of track and other connected miscellaneous works etc.at Parli yard
Items - Raipur Division - Bilaspur-Durg - TBR - 62.542 Tkm under the jurisdiction of ADEN/I/Bhilai & Raipur-Lakholi-TBR - 7.072 Tkm under the jurisdiction of ADEN/Track/Raipur
Items - VR-JRS Sec.:- Repairs to P.way under SSE(P.way), Valsad Section for a period of 2years.
Items - KTYM Sub division: Deweeding in colony, station premises and platforms for two years
Items - Reliability improvement of interlocked LC gate by providing Slide Boom in Sealdah Division.
Items - (1) MACLS Outdoor and Indoor works in connection with provision of Distributed Electronic Interlocking at Guntakal West Station (2) MACLS Outdoor and Indoor works (Alteration to existing Kyosan make EI) at Mallappa Gate station and (3) Shifting of S&T gears at Guntakal West Station (from km.0.00 to km. 2.00) & Mallappa Gate station (from km.8.10 to km. 9.64).
Items - Comprehensive contract for modification of coaches as RDSO modification sheet No (i) : RDSO/PE/MS/AC/0089(Rev 0-2022, Dated: 06.02.2023 for Differential Pressure switch, (ii) RDSO/PE/MS/AC/0087(Rev.0)/2022, Dated 07.06.2022 for NTC sensor, for LHB AC coaches of IZN Division.
Items - Provision / improvement of Amenities (other than FOB) for Divyangjan at the station as per new guidelines by the Railway Board under the jurisdiction of Divisional Engineer (North) Jabalpur
Items - CCG-VR section - Virar Carshed - Proposal for outsourcing maintenance of new assets in VR carshed for a period of two years.
Items - In-Situ Reconditioning of CMS Crossing using Robotic Welding Machine in DEN/North Jurisdiction.