Items - BP 1 BP 2 with spares as per serial number 4 point 2 of section I at caisson location,BP 3 BP 4 with spares as per serial number 4 point 2 of section I at test tank,BP 5 BP 6 with spares as per serial number 4 point 2 of section I at control tank,Visit for item no BP 3 BP 4 and item no BP 5 BP 6,Visit for item no BP 1 BP 2,Delivery as per mentioned in the NIT document clause 9 th point page number 25
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | BP 1 BP 2 with spares as per serial number 4 point 2 of section I at caisson location | 1a Ballast pump with priming unit Spacer coupling with spares O-ring tool kit fixing mechanical shaft seal mechanical shaft seal | 2 | Nos | snpabove25 | 270 |
2 | BP 3 BP 4 with spares as per serial number 4 point 2 of section I at test tank | 1b Ballast pump with spacer coupling with spares like O ring tool kit fixing mechanical shaft seal mechanical shaft seal | 2 | Nos | snpabove25 | 270 |
3 | BP 5 BP 6 with spares as per serial number 4 point 2 of section I at control tank | 1c Seawater ballast pump with Spacer Coupling with spares like O ring tool kit fixing mechanical shaft seal mechanical shaft seal | 2 | Nos | snpabove25 | 270 |
4 | Visit for item no BP 3 BP 4 and item no BP 5 BP 6 | 2a Technical support by deploying relevant engineer or technical manpower during installation, testing and commissioning of ballast pumps with electrical motors at site for item BP3, BP 4 and item BP 5, BP 6 | 12 | Days | snpabove25 | 270 |
5 | Visit for item no BP 1 BP 2 | 2b Technical support by deploying relevant engineer or technical manpower during installation, testing and commissioning of ballast pumps with electrical motor at site for item BP 1, BP 2 | 10 | Days | snpabove25 | 270 |
6 | Delivery as per mentioned in the NIT document clause 9 th point page number 25 | Delivery | 1 | Lumpsum | snpabove25 | 270 |