Bidhelp
Ministry of Defence
Department of Military Affairs
Not Found
RAJASTHAN QTY : 5

Items - Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh,Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh1,Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh2,Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh3,Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh4

Tender Details
Costs
Documents
BOQ
Item NumberItem TitleItem DescriptionItem QuantityUnit of MeasureConsignee IDDelivery Period (In number of days)
1 Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh Studying minutely the te becoming unfunctional,hustifying with reasoning and technical analysis. Suggesdting remedial measures by way of Repair/Rectificaton Rehabilation/modification/Additioin/Alteration including implementing latest technology and advance measures or Provisioning of new hanger gate with latest technilogies in current trend in case of not recomended for repair 1 Nos bsgeafsuratgarh 15
2 Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh1 Making structural and architectural drawing like plan, Elevation,Corss Section & other Engineering details, details of important and complex section/splices having full detailing,description and notes 1 Nos bsgeafsuratgarh 15
3 Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh2 Detailed design with design calculation and analysis of members and section in accordance of relevant IS code considering all parameters of peak load,peck wind pressure of Suratgarh Station,gate etc and vetting thge design from IIT/NIT College & Ensuring/Suggesting all parameters for full functional gate for 10 year maintance free operation. 1 Nos bsgeafsuratgarh 15
4 Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh3 Prepartion of BOQ DCS based upon MES SSR 2020 Drawings and drafting tendere specification. Note- The Consultant should have an experience of hanger gate consultancy for 5 years. The consultant shall visit the site twice during execution of the work. 80% of the payment shall be released on approval of DPR from of CE and CWE office and full payment shall be done on completion of the Job. 1 Nos bsgeafsuratgarh 15
5 Provn of RepairRehabilation hanger Gate at 155 HU AF Suratgarh4 The consultance shall prep a ppt and brief with all drawg calculation specification suggestion & recomendations. 1 Nos bsgeafsuratgarh 15