Items - 24 core OFC cable,12 core OFC cable,48 port fully loaded LIU,24 port fully loaded LIU,05 meters SM Patch cords,40mm PLB HDPE conduit,Manhole or Inspection Chamber,Electronic OFC cable route markers with reader and mile stones as per the site requirement,HDPE conduit couplers,OFC splice enclosures,Laying of 24 core OFC cable through 40mm HDPE conduite,Laying of 12 core OFC cable through 40mm HDPE conduite,Installation
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | 24 core OFC cable | Supply of outdoor Armored Single Mode Optical Fiber Cable 24 core | 4500 | Meters | vsuneetha | 50 |
2 | 12 core OFC cable | Supply of outdoor Armored Single Mode Optical Fiber Cable 12 core | 10500 | Meters | vsuneetha | 50 |
3 | 48 port fully loaded LIU | Supply of Single mode SC type fully loaded with adaptors, pigtails and all other required accessories.1U LIU shall be mountable in 19 inch standard rack. | 4 | Nos | vsuneetha | 50 |
4 | 24 port fully loaded LIU | Supply of Single mode SC type fully loaded with adaptors, pigtails and all other required accessories.1U LIU shall be mountable in 19 inch standard rack. | 4 | Nos | vsuneetha | 50 |
5 | 05 meters SM Patch cords | Supply of Single mode SC to SC patch cord of 5 meters | 40 | Nos | vsuneetha | 50 |
6 | 40mm PLB HDPE conduit | Supply of 40mm PLB HDPE conduit | 15000 | Meters | vsuneetha | 50 |
7 | Manhole or Inspection Chamber | As per the site requirement. As per technical specifications in tender document | 12 | Nos | vsuneetha | 50 |
8 | Electronic OFC cable route markers with reader and mile stones as per the site requirement | As per the site requirement for every 150 meters, The smart RF electronic route markers shall be supplied along with smart RF reader as per the scope of work mentioned in the tender document. The cost quoted shall be inclusive of RF smart electronic route markers (80 no.s), reader (01 no.s) and milestones (19 no.s). | 100 | Nos | vsuneetha | 50 |
9 | HDPE conduit couplers | HDPE couplers shall be installed for joining the HPDE conduites where ever conduit joining is required as per the site requirement. AAI will not pay extra amount other than the price quoted for this item in case of extra quantity is required for execution of the work. | 1 | Lot | vsuneetha | 50 |
10 | OFC splice enclosures | OFC splice enclosures where ever OFC joints are required | 20 | Nos | vsuneetha | 50 |
11 | Laying of 24 core OFC cable through 40mm HDPE conduite | Price quoted shall be inclusive of Horizontal directional drilling , Laying of OFC cable through PLB duct after HDD ,OFC Splicing, Vegetation clearance and manual digging where HDD is not feasible,layining through GI pipes where ever required, laying of OFC through HDPE in chambers manually where HDD is not feasible, back filling, termination of OFC in LIUs as per the site requirement and as specified in the scope of work and payment will be made as per the actuals on pro-rata basis | 1 | Job | vsuneetha | 50 |
12 | Laying of 12 core OFC cable through 40mm HDPE conduite | Price quoted shall be inclusive of Horizontal directional drilling , Laying of OFC cable through PLB duct after HDD ,OFC Splicing, Vegetation clearance, manual digging where HDD is not feasible, layining through GI pipes where ever required laying of OFC through HDPE in chambers manually where HDD is not feasible, back filling, termination of OFC in LIUs as per the site requirement and as specified in the scope of work and payment will be made as per the actuals on pro-rata basis | 1 | Job | vsuneetha | 50 |
13 | Installation | Price quoted shall be inclusive of Installation, Testing and Commissioning of items mentioned in S.No 3, 4, 5, 7, 8, 9, 10 and any other accessesories required for execution of work | 1 | Job | vsuneetha | 50 |