Ministry of Defence
Department of Military Affairs
NA
JAMMU & KASHMIR QTY : 12

Items - consultancy Services for Design and preparation for CHS,inside desired temperature 20 plus minus and 20 degree celsius,min outside ambient temperature minus thirty five degree celsius,altitude above MSL 3800 Mtrs Refer Altitude,under Mentioned elements shall be included in the above work Heat load calculation and design will be provide for each building as per drawings,the bidders are required to provide the architectural drawing in auto cad format,preparation and developing complete conceptual plan for all buildings comma preparation of drawing for complete layout of CHS,preparation of site plan duly marked with existing and proposed external electrical and mechanical service,layout of pipeline of CHS along the entire building locations comma heal load calculation for each building as per ASHAR and ISHARE standard,design calculation and selection for criteria for pipes electrical pump boilers FCUs and air handing units along with specification,Capacity and marking the location of FCUs in each room of various

Tender Details
Costs
Documents
BOQ
Item NumberItem TitleItem DescriptionItem QuantityUnit of MeasureConsignee IDDelivery Period (In number of days)
1 consultancy Services for Design and preparation for CHS Consultancy Services for Design and preparation for CHS under the Provn of Offrs accommodation at UFSR at Kiari Mil Stn under GE 860 EWS 1 Job BSO@GE860EWS 30
2 inside desired temperature 20 plus minus and 20 degree celsius Inside desired temperature 20 plus minus and 20 degree celsius 1 Job BSO@GE860EWS 30
3 min outside ambient temperature minus thirty five degree celsius Min outside ambient temperature minus thirty five degree celsius 1 Job BSO@GE860EWS 30
4 altitude above MSL 3800 Mtrs Refer Altitude Altitude above MSL 3800 Mtrs Refer Altitude 1 Job BSO@GE860EWS 30
5 under Mentioned elements shall be included in the above work Heat load calculation and design will be provide for each building as per drawings mentioned elements shall be included in the above work Heat load calculation an design will be provide for each building as per drawings comma Preparation and verification of drawing for layout of FCUs mixture supply pipeline and return pipeline comma preparation of site plan of proposed services and CHS Plant comma design and verification to be calculated for the size of pipeline pumps oil fire burners cables panels and FCUs and AHUs along with specification comma preparation for CHS plant system of mechanical and electrical and allied works along with rate analysis supported by quotation comma layout of 1 Job BSO@GE860EWS 30
6 the bidders are required to provide the architectural drawing in auto cad format the vendors are required to provide the architectural drawing in auto card format for completion of the actual equipment of work 1 Job BSO@GE860EWS 30
7 preparation and developing complete conceptual plan for all buildings comma preparation of drawing for complete layout of CHS Preparation and developing complete conceptual plan for all buildings comma preparation of drawing for complete layout of CHS of showing the location of plant room including all major equipment light glycol hot water generator flue gas pipes pumps pressurization unit and return pipeline 1 Job BSO@GE860EWS 30
8 preparation of site plan duly marked with existing and proposed external electrical and mechanical service Preparation of site plan duly marked with existing and proposed external electrical and mechanical service for the complete CHS plant 1 Job BSO@GE860EWS 30
9 layout of pipeline of CHS along the entire building locations comma heal load calculation for each building as per ASHAR and ISHARE standard Layout of pipeline of CHS along the entire building locations comma heal load calculation for each building as per ASHAR and ISHARE standard and relevant tech reference as applicable 1 Job BSO@GE860EWS 30
10 design calculation and selection for criteria for pipes electrical pump boilers FCUs and air handing units along with specification Design calculation and selection for criteria for pipes electrical pump boilers FCUs and air handing units along with specification as available in maket with reuputed vendor and OEM 1 Job BSO@GE860EWS 30
11 Capacity and marking the location of FCUs in each room of various buildings comma detailed analysis and justification of accessories related to boilers like centrifugal pump Analysis of FCUs capacity and marking the location of FCUs in each room of various buildings comma detailed analysis and justification of acces complete system including mechanical electrical and allied civil works with rate analysis based on marked rated and quotation 1 Job BSO@GE860EWS 30
12 design should include the necessary LT panels reqd on site and also the feasibility of utilization The necessary LT panels reqd on site and also the feasibility of utilization of items already brought on site suitable LT cable form the transformer to various 1 Job BSO@GE860EWS 30