Items - BRICK WORK,10MM CEMT PLASTERING,15 MM CEMT PLASTERING,PREPARATION OF SURFACE,ALLUMINUM DOORS,ALLUMINUM WINDOWS,FLOOR,FALSE CEILING,WIRRING 1.5 SQMM PVC,WIRRING 2.5 SQMM PVC,SUPPLY FIXING AC POINT
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | BRICK WORK | BRICK WORK | 35 | SUM | echspatiala147001 | 60 |
2 | 10MM CEMT PLASTERING | 10MM CEMT PLASTERING | 120 | SQM | echspatiala147001 | 60 |
3 | 15 MM CEMT PLASTERING | 15 MM CEMT PLASTERING | 120 | SQM | echspatiala147001 | 60 |
4 | PREPARATION OF SURFACE | PREPARATION OF SURFACE | 240 | SQM | echspatiala147001 | 60 |
5 | ALLUMINUM DOORS | ALLUMINUM DOORS | 4 | SQM | echspatiala147001 | 60 |
6 | ALLUMINUM WINDOWS | ALLUMINUM WINDOWS | 9 | SQM | echspatiala147001 | 60 |
7 | FLOOR | FLOOR | 110 | SQM | echspatiala147001 | 60 |
8 | FALSE CEILING | FALSE CEILING | 110 | SQM | echspatiala147001 | 60 |
9 | WIRRING 1.5 SQMM PVC | WIRRING 1.5 SQMM PVC | 50 | POINT | echspatiala147001 | 60 |
10 | WIRRING 2.5 SQMM PVC | WIRRING 2.5 SQMM PVC | 5 | POINT | echspatiala147001 | 60 |
11 | SUPPLY FIXING AC POINT | SUPPLY FIXING AC POINT | 70 | MTR | echspatiala147001 | 60 |