Items - Non- Comprehensive Annual Maintenance Contract for Groundfos Pumps for 1st year,Non- Comprehensive Annual Maintenance Contract for Groundfos Pumps for 2nd year,All inclusive CMC of Ion Exchange Zero B make water purifier cum cooler for 1st year,All inclusive CMC of Ion Exchange Zero B make water purifier cum cooler for 2nd year,Carrying out complete servicing and overhauling of ACBs with 2000A for 1st year,Carrying out complete servicing and overhauling of ACBs with 2000A for 2nd year,Carrying out complete servicing and overhauling of ACBs with 800A for 1st year,Carrying out complete servicing and overhauling of ACBs with 800A for 2nd year,Carrying out complete servicing and overhauling of 11KV HT VCB for 1st year,Carrying out complete servicing and overhauling of 11KV HT VCB for 2nd year,DSR item,Supply and installation of pressure gauge 100mm,Supply and installation of pressure switch,Supply and installation of air release valve,Supply and installation of brass type ball valve 1 inch,Supply and installation
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | Non- Comprehensive Annual Maintenance Contract for Groundfos Pumps for 1st year | Non- Comprehensive Annual Maintenance Contract for Groundfos Pumps /systems installed in the AAI Residential Colony with the OEM of the pumps. Sweet Water HNS. 3XCRE 5-6 (2W+1S), Salt Water HNS. 3XCRE 5-6 (2W+1S). The contractor has to enter AMC with the OEM/OEM authorized dealer on behalf of AAI and submit the agreement details to AAI. The AMC shall consists of 4 scheduled visits and 4 emergency visits during which the OEM shall carry out Routine maintenance to identify major/minor problems, if any and carry out minor repair at site and submit service reports for 1st year | 12 | Months | prajeeshgjohn | 730 |
2 | Non- Comprehensive Annual Maintenance Contract for Groundfos Pumps for 2nd year | Non- Comprehensive Annual Maintenance Contract for Groundfos Pumps /systems installed in the AAI Residential Colony with the OEM of the pumps. Sweet Water HNS. 3XCRE 5-6 (2W+1S), Salt Water HNS. 3XCRE 5-6 (2W+1S). The contractor has to enter AMC with the OEM/OEM authorized dealer on behalf of AAI and submit the agreement details to AAI. The AMC shall consists of 4 scheduled visits and 4 emergency visits during which the OEM shall carry out Routine maintenance to identify major/minor problems, if any and carry out minor repair at site and submit service reports for 2nd year | 12 | Months | prajeeshgjohn | 730 |
3 | All inclusive CMC of Ion Exchange Zero B make water purifier cum cooler for 1st year | All inclusive CMC of Ion Exchange Zero B make water purifier cum cooler, model-Eco Chill 60-80-50 (without display) including all necessary consumables, spares, filters, carrying out 03 periodical visit per year for preventive maintenance checks, any number of breakdown visits, one time replacement of sediment, carbon and membrane filters to keep the equipment in perfect working condition complete as required. (The contractor has to enter AMC with the OEM/OEM authorized dealer on behalf of AAI and submit the agreement details and service/breakdown reports to AAI). for 1st year | 6 | Job or Year | prajeeshgjohn | 730 |
4 | All inclusive CMC of Ion Exchange Zero B make water purifier cum cooler for 2nd year | All inclusive CMC of Ion Exchange Zero B make water purifier cum cooler, model-Eco Chill 60-80-50 (without display) including all necessary consumables, spares, filters, carrying out 03 periodical visit per year for preventive maintenance checks, any number of breakdown visits, one time replacement of sediment, carbon and membrane filters to keep the equipment in perfect working condition complete as required. (The contractor has to enter AMC with the OEM/OEM authorized dealer on behalf of AAI and submit the agreement details and service/breakdown reports to AAI). for 2nd year | 6 | Job or Year | prajeeshgjohn | 730 |
5 | Carrying out complete servicing and overhauling of ACBs with 2000A for 1st year | Carrying out complete servicing and overhauling of all mechanical and electrical mechanism of L&T make, Omega, UW1-20N, Electrical Draw Out Microprocessor type (EDO) ACBs with 2000 A rating installed in the LT panels by providing trained service engineer with all tools and plant i/c attending all breakdown repairs during the period of contract complete as per detailed specifications of work and instructions of Engineer -in-charge for 1st year | 3 | Job | prajeeshgjohn | 730 |
6 | Carrying out complete servicing and overhauling of ACBs with 2000A for 2nd year | Carrying out complete servicing and overhauling of all mechanical and electrical mechanism of L&T make, Omega, UW1-20N, Electrical Draw Out Microprocessor type (EDO) ACBs with 2000 A rating installed in the LT panels by providing trained service engineer with all tools and plant i/c attending all breakdown repairs during the period of contract complete as per detailed specifications of work and instructions of Engineer -in-charge for 2nd year | 3 | Job | prajeeshgjohn | 730 |
7 | Carrying out complete servicing and overhauling of ACBs with 800A for 1st year | Carrying out complete servicing and overhauling of all mechanical and electrical mechanism of L&T make, Omega, UW1-08N, Electrical Draw Out Microprocessor type (EDO) ACBs with 800A rating installed in the LT panels by providing trained service engineer with all tools and plant i/c attending all breakdown repairs during the period of contract complete as per detailed specifications of work and instructions of Engineer -in-charge for 1st year | 9 | Job | prajeeshgjohn | 730 |
8 | Carrying out complete servicing and overhauling of ACBs with 800A for 2nd year | Carrying out complete servicing and overhauling of all mechanical and electrical mechanism of L&T make, Omega, UW1-08N, Electrical Draw Out Microprocessor type (EDO) ACBs with 800A rating installed in the LT panels by providing trained service engineer with all tools and plant i/c attending all breakdown repairs during the period of contract complete as per detailed specifications of work and instructions of Engineer -in-charge for 2nd year | 9 | Job | prajeeshgjohn | 730 |
9 | Carrying out complete servicing and overhauling of 11KV HT VCB for 1st year | Carrying out complete servicing and overhauling of all mechanical and electrical mechanism of Megawin make, Model.- MHVCB, 11 KV HT VCBs installed in HT panels by providing trained service engineer with all tools and plant i/c attending all breakdown repairs during the period of contract complete as per detailed specifications of work and instructions of Engineer -in-charge for 1st year. | 3 | Job | prajeeshgjohn | 730 |
10 | Carrying out complete servicing and overhauling of 11KV HT VCB for 2nd year | Carrying out complete servicing and overhauling of all mechanical and electrical mechanism of Megawin make, Model.- MHVCB, 11 KV HT VCBs installed in HT panels by providing trained service engineer with all tools and plant i/c attending all breakdown repairs during the period of contract complete as per detailed specifications of work and instructions of Engineer -in-charge for 2nd year. | 3 | Job | prajeeshgjohn | 730 |
11 | DSR item | Execution of items of schedule of rates CPWD DSR (E&M)-2022 as and when required for attending breakdowns, repair & maintenance and upkeep of electrical installations as per direction of E-I-C at different locations in Power supply HT & LT installations, Standby DG Sets, Internal & External electrical installations as per the special Terms and Condition in addition to General Terms and Condition of Contract as required. The bidder shall quote the rate in INR only for the job corresponding to Rs.4,00,000/- and percentage (%) above / below shall be calculated by AAI and paid accordingly after deducting GST component from the DSR-2022 (E&M) rates. | 1 | Job | prajeeshgjohn | 730 |
12 | Supply and installation of pressure gauge 100mm | Supply and installation of pressure gauge, Dial Size 4 (100 mm) mini, Range 0 to 16 Kg/Cm2 minimum, Bourdon Tube type, Wetted Parts & Case Material made of Stainless Steel 304, Protection Class of IP 65, Surface Mounting, Bottom Entry suitable for installation in the existing fire hydrant system complete with all required accessories as required. | 4 | Each | prajeeshgjohn | 730 |
13 | Supply and installation of pressure switch | Supply and installation of pressure switch of make Danfoss, Model-KP35, in the existing fire hydrant system including making required connections, adjustments complete as required. | 4 | Each | prajeeshgjohn | 730 |
14 | Supply and installation of air release valve | Supply and installation of air release valve made from Forged Brass, 25 mm PN - 16 of make Zoloto -1095 or Leader GM 210 in the existing fire hydrant system including all the required accessories complete as required. | 4 | Each | prajeeshgjohn | 730 |
15 | Supply and installation of brass type ball valve 1 inch | Supply and installation of brass type ball valve 1 inch size, 16 kg/sqmm mini, suitable for installing in the existing fire hydrant system complete with all required accessories as required. | 12 | Each | prajeeshgjohn | 730 |
16 | Supply and installation of fire shut off nozzle for hose reel | Supply and installation of fire shut off nozzle for hose reel, 20 mm size, made of gun metal, in the existing fire hydrant system complete with all required accessories as required. | 18 | Each | prajeeshgjohn | 730 |
17 | Supplying and fixing 63 mm dia SS short branch pipe | Supplying & fixing 63 mm dia SS short branch pipe with 20 mm nominal internal diameter size nozzle with ISI mark suitable for instantaneous connection to interconnect hose pipe coupling as required. Stainless Steel (Grade 304) | 3 | Each | prajeeshgjohn | 730 |
18 | Supplying and fixing 63 mm dia, 15 m long RRL hose pipe | Supplying and fixing 63 mm dia, 15 m long RRL hose pipe with 63 mm dia male and female couplings of SS, duly bound with GI wire, rivets etc. conforming to IS 636 (type-A) as required | 5 | Each | prajeeshgjohn | 730 |
19 | Providing, installation, testing and commissioning of cast iron wafer type non return valve | Providing, installation, testing and commissioning of cast iron wafer type non-return valve of following sizes complete with rubber gasket but without flange in the existing Fire Hydrant system as required. 100mm dia (Leader Cast Iron Wafer Type Check Valve CI 038 100mm (4 Inch) or equivalent from list of Approved makes) | 6 | Job | prajeeshgjohn | 730 |
20 | Supplying, fixing, testing and commissioning of Cast Iron wafer type butterfly valve 80 mm dia | Supplying, fixing, testing and commissioning of Cast Iron wafer type butterfly valve of PN 1.6 rating EPDM lining complete with gaskets but without flange of following sizes as required. 80 mm dia (Leader 3 Inch, 80 mm Cast Iron Butterfly Valve CI 091 or equivalent in approved make list). | 6 | Job | prajeeshgjohn | 730 |
21 | Supplying, fixing, testing and commissioning of Cast Iron wafer type butterfly valve 100 mm dia | Supplying, fixing, testing and commissioning of Cast Iron wafer type butterfly valve of PN 1.6 rating EPDM lining complete with gaskets but without flange of following sizes as required. 100 mm dia (Leader 3 Inch, 80 mm Cast Iron Butterfly Valve CI 091 or equivalent in approved make list). | 6 | Job | prajeeshgjohn | 730 |
22 | Supply of fire hydrant landing valve blank cap | Supply of fire hydrant landing valve blank cap (ABS) with locking chain complete as required. | 6 | Each | prajeeshgjohn | 730 |
23 | Supply of fire brigade inlet rubber cap | Supply of fire brigade inlet rubber cap with locking chain complete as required. | 10 | Each | prajeeshgjohn | 730 |
24 | Repair of 7.5 HP motor pump | Repair of 7.5 HP, Kirloskar make, Model.- KDI-830TT motor pump set installed in the terrace of AAI residential colony, rewinding servicing & varnishing if required, making the motor pump set operational complete as required and as per instructions of Engineer-in-Charge. | 3 | Job | prajeeshgjohn | 730 |
25 | Supplying, installation, testing and commissioning of Honeywell resettable type manual call point | Supplying, installation, testing & commissioning of Honeywell make MCP2A/R470FF/01 resettable type manual call point in the existing box with complete as required. | 15 | Each | prajeeshgjohn | 730 |
26 | Supplying, installation, testing and commissioning of Honeywell make Hooter MHR | Supplying, installation, testing & commissioning of Honeywell make sounder/Hooter MHR/1 type complete as required | 15 | Each | prajeeshgjohn | 730 |
27 | Supply installation testing and commissioning of 12V, 7 Ah Sealed Maintenance Free Battery | Supply installation testing & commissioning of 12V, 7 Ah Sealed Maintenance Free Battery for Power backup to the System Sensor fire alarm panels installed in various residential blocks | 20 | Each | prajeeshgjohn | 730 |
28 | Supply of activated carbon media | Supply of activated carbon media for use in the existing STP filter housing as per instructions of Engineer-in-Charge | 2000 | Kg | prajeeshgjohn | 730 |
29 | Supply of sand media | Supply of sand media for use in the existing STP filter housing as per instructions of Engineer-in-Charge | 2000 | Kg | prajeeshgjohn | 730 |
30 | Supply and installation of 2 HP capacity aerator | Supply and installation of 2 HP capacity aerator with accessories such as PVC pipes in the existing collection tank of STP complete as required. | 1 | Job | prajeeshgjohn | 730 |
31 | Supply of bar screen SS mesh | Supply of bar screen SS mesh of suitable size in the existing STP chamber to filter out solid substance by removing the existing system and installing the new system complete as required. | 1 | Job | prajeeshgjohn | 730 |
32 | Replacement of Sand filter | Replacement of Sand filter media from the respective tank after removal of existing media, disposing it at suitable location, transportation of new media from AAI store to site and installing, and commissioning of the system complete as required. | 2 | Job | prajeeshgjohn | 730 |
33 | Replacement of carbon filter | Replacement of carbon filter media from the respective tank after removal of existing media, disposing it at suitable location, transportation of new media from AAI store to site and installing, and commissioning of the system complete as required. | 2 | Job | prajeeshgjohn | 730 |
34 | Supply and installation of uPVC ball valve SCH 80, 2 inch size | Supply and installation of uPVC ball valve SCH 80, 2 inch size in the existing STP system complete as required. Make.- Ashirvad/Supreme or from the list of approved makes | 6 | Job | prajeeshgjohn | 730 |
35 | Supply and installation of uPVC ball valve SCH 80, 1 inch size | Supply and installation of uPVC ball valve SCH 80, 1 inch size in the existing STP system complete as required. Make.- Ashirvad/Supreme or from the list of approved makes | 2 | Job | prajeeshgjohn | 730 |
36 | Supply and installation of uPVC ball valve SCH 80 | Supply and installation of uPVC ball valve SCH 80, 1-1/4 inch size in the existing STP system complete as required. Make- Ashirvad/Supreme or from the list of approved makes | 4 | Job | prajeeshgjohn | 730 |
37 | Supply and installation of butterfly valve, 3 Inch, 80 mm | Supply and installation of butterfly valve, 3 Inch, 80 mm, Cast Iron EPDM Wafer Type Lever Operated type in the existing STP system complete as required. Make.- Zoloto/Sant/ Leader or from the list of approved makes | 6 | Job | prajeeshgjohn | 730 |
38 | Supply and installation of butterfly valve, 2 Inch, 50 mm | Supply and installation of butterfly valve, 2 Inch, 50 mm, Cast Iron EPDM Wafer Type Lever Operated type in the existing STP system complete as required. Make- Zoloto/Sant/ Leader or from the list of approved makes | 4 | Job | prajeeshgjohn | 730 |
39 | Supply and installation of 2 Inch, 50 mm Cast Iron Dual Plate Check Valve | Supply and installation of 2 Inch, 50 mm Cast Iron Dual Plate Check Valve (NRV), PN-16 class, Wafer Type end connection in the existing STP system complete as required. Make.- Zoloto/Sant/ Leader or from the list of approved makes | 2 | Job | prajeeshgjohn | 730 |
40 | Supply and installation of 3 Inch, 80 mm Cast Iron Dual Plate Check Valve | Supply and installation of 3 Inch, 80 mm Cast Iron Dual Plate Check Valve (NRV), PN-16 class, Wafer Type end connection in the existing STP system complete as required. Make.- Zoloto/Sant/ Leader or from the list of approved makes | 2 | Job | prajeeshgjohn | 730 |
41 | Supply and installation of 32 mm Bronze Swing Check Valve | Supply and installation of 32 mm Bronze Swing Check Valve (NRV), in the existing STP system complete as required. Make.- Zoloto/Sant/ Leader or from the list of approved makes | 2 | Job | prajeeshgjohn | 730 |
42 | Supply of SS 304 grade M12 grade bolt | Supply of SS 304 grade M12 grade bolt (75 mm), SS 304 grade suitable nut for the bolt, 02 no SS 304 grade flat washer and replacing the old rusted bolt & nut with new ones after applying WD 40/grease to avoid rusting in STP system. | 75 | Set | prajeeshgjohn | 730 |
43 | Supply of Shell Omala S4 WE 320 gear box oil | Supply of Shell Omala S4 WE 320 gear box oil/ equivalent recommended by OEM suitable for Bonfiglioli AS 80 gearbox installed in the existing STP system and replacing the old gear box oil complete as required. | 20 | Ltr | prajeeshgjohn | 730 |
44 | Supply of Plummer block SN 517v alongwith SFK Double-Row Spherical Roller Bearing | Supply of Plummer block SN 517v alongwith SFK Double-Row Spherical Roller Bearing with standard bore and replacing the damaged bearing in the STP system complete as required. (The Hydra/crane charges for lifting the lamella not be included) | 6 | Job | prajeeshgjohn | 730 |
45 | Hire Charges of Moving Hydraulic Crane | Hire Charges of Moving Hydraulic Crane/Hydra Services for Loading / Unloading of Lamella of STP system in the AAI Residential Colony, Coimbatore International Airport | 40 | Hour | prajeeshgjohn | 730 |
46 | Supply and installation of 2 inch UPVC Flange | Supply and installation of 2 inch (50mm) UPVC Flange with in the existing pipe after removing old/broken/cutting pipe complete as required. | 4 | Job | prajeeshgjohn | 730 |
47 | Supply and installation of 2 inch CPVC Flange | Supply and installation of 2 inch (50mm) CPVC Flange with in the existing pipe after removing old/broken/cutting pipe complete as required. | 4 | Job | prajeeshgjohn | 730 |
48 | Supply and installation of 3 inch UPVC Flange | Supply and installation of 3 inch (80mm) UPVC Flange with in the existing pipe after removing old/broken/cutting pipe complete as required. | 4 | Job | prajeeshgjohn | 730 |
49 | Supply and installation of 4 inch CPVC Flange | Supply and installation of 4 inch (100mm) CPVC Flange with in the existing pipe after removing old/broken/cutting pipe complete as required. | 4 | Job | prajeeshgjohn | 730 |
50 | Testing of treated water of STP in NABL accredited lab | Testing of treated water of STP in NABL accredited lab for the following parameters such as pH, Total Suspended Solids, Total Dissolved Solids, Oil & Grease, Chemical Oxygen Demand, Bio chemical oxygen Demand, Coliform Count etc and submitting the report to the Engineer-In-charge as required. | 24 | Job | prajeeshgjohn | 730 |
51 | Testing of drinking water sample in NABL accredited lab | Testing of drinking water sample in NABL accredited lab for the following parameters such as pH, Total Suspended Solids, Total Dissolved Solids, Oil & Grease, Chemical Oxygen Demand, Bio chemical oxygen Demand, Coliform Count etc and submitting the report to the Engineer-In-charge as required. | 24 | Job | prajeeshgjohn | 730 |
52 | Supply and replacing of filter PP Spun 20 micron 10 inch | Supply and replacing of filter PP Spun 20 micron 10 inch, in the existing water purifier cum cooler of Ion Exchange Zero B make, model-Eco Chill 60-80-50 complete as required. (Note- The filter recommended by OEM shall be used) | 12 | Job | prajeeshgjohn | 730 |
53 | Supply and replacing of carbon block 10 micron, 10 inch filter | Supply and replacing of carbon block 10 micron, 10 inch filter in the existing water purifier cum cooler of Ion Exchange Zero B make, model-Eco Chill 60-80-50 complete as required. (Note- The filter recommended by OEM shall be used) | 8 | Job | prajeeshgjohn | 730 |
54 | Supply and replacing of membrane filter 100 GPD | Supply and replacing of membrane filter 100 GPD in the existing water purifier cum cooler of Ion Exchange Zero B make, model-Eco Chill 60-80-50 complete as required. (Note.- The filter recommended by OEM shall be used) | 6 | Job | prajeeshgjohn | 730 |
55 | Repair of 450 mm heavy duty exhaust fan | Repair of 450 mm heavy duty exhaust fan by rewinding servicing & varnishing if required, making the fan operational complete as required and as per instructions of Engineer-in-Charge. | 10 | Job | prajeeshgjohn | 730 |
56 | Repair of 600 mm heavy duty wall mounted type Air circulator fan | Repair of 600 mm heavy duty wall mounted type Air circulator fan by rewinding servicing & varnishing if required, making the fan operational complete as required and as per instructions of Engineer-in-Charge. | 10 | Job | prajeeshgjohn | 730 |
57 | Repair of 600 mm heavy duty pedestal type Air circulator fan | Repair of 600 mm heavy duty pedestal type Air circulator fan by rewinding servicing & varnishing if required, making the fan operational complete as required and as per instructions of Engineer-in-Charge. | 10 | Job | prajeeshgjohn | 730 |
58 | Skilled man power | Supply of skilled man power as and when required for carrying out special maintenance activities. | 40 | Days | prajeeshgjohn | 730 |
59 | Unskilled man power | Supply of unskilled man power as and when required for carrying out special maintenance activities. | 40 | Days | prajeeshgjohn | 730 |
60 | Skilled welder man power | Supply of skilled welder man power along with welding machine, welding rod for welding, gas cutting etc as and when required. | 40 | Days | prajeeshgjohn | 730 |