Items - Removal of complete old electric wiring and fitment of new Electrical Complete Wiring New to include all lamp bulb indicator,Removal of old existing door runner and fitment of new Door Runner with beading door lock,Fitment of complete new rear window assembly with full wedding kits 02 Windows,Removal and replacement of old Centre joint with new Centre joint to include repair of all minor parts,Removal and replacement repair of Clutch Assembly, release bearing and flywheel ring,Removal of old existing Engine Aluminium Sheet and fitment of new Engine Aluminium Sheet,Carryout Tuning of Engine correction,Removal of all doors and complete repair of all door panels and replacement fitment of complete switches 04 x doors,Correction and carryout of Wheel balancing and Wheel alignment,Removal and replacement with Master Cylinder Assembly to include repair of minor parts,Complete repair of Starter fitment of new starter if required
Item Number | Item Title | Item Description | Item Quantity | Unit of Measure | Consignee ID | Delivery Period (In number of days) |
---|---|---|---|---|---|---|
1 | Removal of complete old electric wiring and fitment of new Electrical Complete Wiring New to include all lamp bulb indicator | As per RFP | 1 | Job | acct1atc | 45 |
2 | Removal of old existing door runner and fitment of new Door Runner with beading door lock | As per RFP | 1 | Job | acct1atc | 45 |
3 | Fitment of complete new rear window assembly with full wedding kits 02 Windows | As per RFP | 1 | Job | acct1atc | 45 |
4 | Removal and replacement of old Centre joint with new Centre joint to include repair of all minor parts | As per RFP | 1 | Job | acct1atc | 45 |
5 | Removal and replacement repair of Clutch Assembly, release bearing and flywheel ring | As per RFP | 1 | Nos | acct1atc | 45 |
6 | Removal of old existing Engine Aluminium Sheet and fitment of new Engine Aluminium Sheet | As per RFP | 1 | Nos | acct1atc | 45 |
7 | Carryout Tuning of Engine correction | As per RFP | 1 | Job | acct1atc | 45 |
8 | Removal of all doors and complete repair of all door panels and replacement fitment of complete switches 04 x doors | As per RFP | 4 | Nos | acct1atc | 45 |
9 | Correction and carryout of Wheel balancing and Wheel alignment | As per RFP | 1 | Job | acct1atc | 45 |
10 | Removal and replacement with Master Cylinder Assembly to include repair of minor parts | As per RFP | 1 | Set | acct1atc | 45 |
11 | Complete repair of Starter fitment of new starter if required | As per RFP | 1 | Nos | acct1atc | 45 |